(7) Remove the tie-down fittings (18): NOTE : The removal procedure for all the tie-down fittings (18) is
____ the same. Therefore, the removal procedure for one tie-down fitting (18) only is given here.
(a) Remove the screws (17) from the tie-down fitting (18).
(b) Remove the tie-down fitting (18) from the structure (3).
**ON A/C ALL
Subtask 25-54-41-020-051
B. Removal of the Tie-Down and Net Attachment Fittings from the Ceiling Area **ON A/C 001-049, 051-099, 101-149, 201-299,
(Ref. Fig. 402/TASK 25-54-41-991-002) R **ON A/C 151-199, 401-499,
(Ref. Fig. 402A/TASK 25-54-41-991-002-A)
**ON A/C 301-399,
(Ref. Fig. 402B/TASK 25-54-41-991-002-B)
**ON A/C ALL
(1) Remove the cargo net(s) (7), if installed:
(a)
Disconnect the net fittings (6) from the tie-down and net attachment fittings of the cargo-compartment floor and ceiling areas.
(b)
Remove the cargo net(s) (7).
EFF : ALL
25-54-41Page 411
Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Ceiling Area Figure 402/TASK 25-54-41-991-002
R EFF : 001-049, 051-099, 101-149, 201-299, 25-54-41Page 412 May 01/05
CES
Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Ceiling Area Figure 402A/TASK 25-54-41-991-002-A
R EFF : 151-199, 401-499, 25-54-41Page 413 Aug 01/05
CES
R Tie-Down and Net Attachment Fittings - FWD Cargo-Compartment Ceiling Area
R Figure 402B/TASK 25-54-41-991-002-B
R EFF : 301-399, 25-54-41 Page 414
May 01/04
CES
(2)
Remove the stanchion fitting (2):
(a)
Remove the screws (3) from the stanchion fitting (2).
(b)
Remove the stanchion fitting (2) from the structure (1).
(3)
Remove the tie-down points (4): NOTE : The removal procedure for all the tie-down points (4) is the
____ same. Therefore, the removal procedure for one tie-down point
(4) only is given here.
(a)
Remove the screws (5) from the tie-down point (4).
(b)
Remove the tie-down point (4) from the structure (1).
(4) Remove the tie-down points (9): NOTE : The removal procedure for all the tie-down points (9) is the
____ same. Therefore, the removal procedure for one tie-down point
(9) only is given here.
(a)
Remove the screws (10) from the tie-down point (9).
(b)
Remove the tie-down point (9) from the spacer (8).
(c)
If necessary, remove the spacer (8):
1 Remove the screws (11) from the spacer (8).
_
2 Remove the spacer (8) from the structure (1).
_ TASK 25-54-41-400-001
Installation of the Tie-Down and Net Attachment Fittings of the FWD Cargo-Compartment
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific non-metal scraper
No specific access platform 2.0 m (6 ft. 7 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)