 that you will seal.

 (b)
 Put the cords (13) in the seat tracks (12).

 (c)
 Make a loop at one end of each of the cords (13). NOTE : This step is to make the next removal procedure easier.

____

 (d)
 Apply SEALANTS (Material No. 09-019) in the seat tracks (12) for a length of 30 mm (1.2 in.).

 (e)
 Push the loops into the sealant.

 


 (4)
 Carefully put the stowage (1) in position.

 (5)
 Install the threaded bushes (9).

 (6)
 Turn the threaded bushes (9) clockwise or counterclockwise to adjust the vertical position of the stowage (1).

 (7)
 Put the outer eccentric-bushes (8) and the inner eccentric-bushes (7) in position.

 (8)
 Turn the eccentric bushes (7) and (8) clockwise or counterclockwise to adjust the horizontal position of the stowage (1).

 (9)
 Install the washers (15), the nuts (6) and (14), and the caps (5).


 (10)
 Put the covers (16) in position and install the screws (17).

 (11)
 Put the upper attachments (3) in position and install the screws (4).

 (12)
 Make sure that all of the placards of the retained/new components are in the correct position and in good condition.

 (13)
 If necessary install new placards (Ref. TASK 11-00-00-400-007) and (Ref. AMM 11-32-25 P.Block 001).


 (14) Close the door (2).
 **ON A/C 201-210,

 Subtask 25-27-44-420-058-B
 B. Installation of the Stowage 6579MM WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR
_______ INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.
 (Ref. Fig. 401B/TASK 25-27-44-991-001-B) R
R (1) Unless specified, TORQUE all nuts, bolts and screws (Ref. TASK 20-21-11-911-001).


R R  (2) Apply COMMON GREASE (Material No. 04-004) to the seat-track fittings (17) and put them in the seat tracks (18) as recorded in the removal procedure. 
R  (3) Seal the seat tracks:
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK. 
R R  (a) Cut the synthetic fiber-cords (19) MISCELLANEOUS (Material No. 19-002) to the necessary length.
 NOTE : The cords (19) must be 50 mm (2 in.) longer than the area____ that you will seal.
 (b) Put the cords (19) in the seat tracks (18).
 (c) Make a loop at one end of each of the cords (19).
 NOTE : This step is to make the next removal procedure easier.____ 
R R  (d) Apply SEALANTS (Material No. 09-019) to the seat tracks (18) for a length of 30 mm (1.2 in.).
 (e) Push the loops into the sealant. 
R  (4) Put the shim plates (16) in position as recorded in the removal procedure. 
R  (5) Carefully put the stowage (1) in position. 
R  (6) Put the outer eccentric-bushes (13) and the inner eccentric-bushes (12) in position. 
R  (7) Turn the eccentric-bushes (12) and (13) clockwise or counterclockwise to adjust the horizontal position of the stowage (1). 
R  (8) Put the shim plates (11) in position as recorded in the removal procedure. 
R  (9) Put the cover plates (11) in position and install the nuts (9). 
R  (10) Put the covers (14) in position and install the screws (15). 
R  (11) Put the cover (4) in position and install the screws (3).

 

R  (12) Put the upper attachments (5) in position and install the screws (6). 
R  (13) Put the covers (7) in position and install the screws (8). 
R  (14) Make sure that all of the placards of the retained/new components are in the correct position and in good condition. 
R  (15) If necessary install new placards (Ref. TASK 11-00-00-400-007) and (Ref. AMM 11-32-25 P.Block 001). 
R  (16) Close the door (2).
 **ON A/C 001-049, 101-105, 151-199, 201-210,
 Subtask 25-27-44-710-071
 C. Do these Tests
 (1) Do a test of the stowage catches and latch-assemblies for satisfactory function.
 (2) Do a test of the stowage door(s) and door-hinges for free movement.
 5. Close-up________
 Subtask 25-27-44-410-055
 A. Close Access
 (1) Install the equipment in the stowage as identified in the removal procedure.
 (2) Make sure that the work area is clean and clear of tool(s) and other items.
 (3) Make sure that the stowage door(s) is(are) closed and locked.
 Subtask 25-27-44-862-055
 B. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
 