 Install the emergency oxygen container (Ref. TASK 35-21-41-400-001).


 EFF : ALL
25-24-41Page 415
May 01/05
R
 CES


 (3)
 Install the fluorescent tube (Ref. TASK 33-21-11-400-001).

 (4)
 Install the cove light panel (Ref. TASK 25-23-48-400-001).

 (5)
 Install the ceiling panel (Ref. TASK 25-23-41-400-001).

 (6)
 Remove the stepladder.

 (7)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 **ON A/C 001-049, 101-105, 151-199,
 Subtask 25-24-41-410-051
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the individual air-outlet panel (Ref. TASK 21-24-19-400-001).

 (3)
 Install the passenger reading light-panel (Ref. TASK 23-73-64-400-001).

 (4)
 Install the passenger service/information units (Ref. TASK 25-25-11-400-001).

 (5)
 Remove the stepladder.

 (6)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


R **ON A/C 051-099, 106-149, 201-299, 301-399, 401-499,
 Subtask 25-24-41-410-051-A
 B. Install the Passenger Service Equipment.
 (1)
 Install the passenger reading-light panel (Ref. TASK 23-73-64-400-001).

 (2)
 Install the passenger service/information units (Ref. TASK 25-25-11-400-001).


 EFF : ALL
25-24-41Page 416


 (3)
 Install the System Control Unit (SCU) (Ref. TASK 23-36-34-400-001).

 (4)
 Remove the stepladder.

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (6)
 Make sure that the work area is clean and clear of tool(s) and other items.


 **ON A/C ALL
 Subtask 25-24-41-865-052
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU CABIN LIGHT POWER-WINDOW FWD 300LG H01 2000VU CABIN LIGHT POWER-WINDOW AFT 301LG H03 2000VU CABIN LIGHT POWER-WINDOW AFT 302LG H04 2000VU CABIN LIGHT POWER-WINDOW FWD 303LG H02 2000VU CABIN LIGHT POWER-CEILING AFT 304LG H07 2000VU CABIN LIGHT POWER-CEILING FWD 305LG H05 2000VU CABIN LIGHT POWER-CEILING FWD 306LG H06 2000VU CABIN LIGHT POWER-CEILING AFT 307LG H08
 Subtask 25-24-41-862-050
 D. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 EFF : ALL
25-24-41Page 417
May 01/05
R
 CES


 INTENTIONALLY BLANK

 

R  TASK 25-24-41-000-002 
R  Removal of the Door of the Overhead Stowage-Compartment 
R  1. Reason for the Job__________________ 
R  Self Explanatory 
R  2. Job Set-up Information______________________ 
R  A. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE  DESIGNATION 
R  -------------------------------------------------------------------------------
R  24-42-00-861-001  Energize the Ground Service Network from the External 
R  Power 
R  25-24-41-991-015  Fig. 405 
R  3. Job Set-up__________ 
R  Subtask 25-24-41-861-051 
R  A. Energize the ground service network 
R  (Ref. TASK 24-42-00-861-001). 
R  4. Procedure_________ 
R  Subtask 25-24-41-020-062 
R  A. Removal of the Overhead Stowage-Compartment Door (referred to as door) 
R  (Ref. Fig. 405/TASK 25-24-41-991-015) 
R  (1) Open the applicable door (1) and hold it so that it does not fall. 
R  (2) Remove the screws (2) and the washers (3), and carefully remove the 
R  door (1).

 EFF : ALL
25-24-41Page 419
Aug 01/02


R R  Door - Overhead Stowage-Compartment Figure 405/TASK 25-24-41-991-015
 EFF :  ALL  25-24-41 Page 420 Aug 01/02
 CES 

 

 TASK 25-24-41-400-002
 Installation of the Door of the Overhead Stowage-Compartment

 1.
 Reason for the Job
 