PANELS - CEILING UTILITY AREA - REMOVAL/INSTALLATION____________________________________________________
TASK 25-23-42-000-001
Removal of the Ceiling Panels - Forward Utility Area
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific No specific No specific blanking capscircuit breaker(s) safety clip(s) 2 CAP - BLANKING, PLASTIC
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 25-23-42-991-001 Energize the Ground Service Network from the External PowerFig. 401
R **ON A/C 216-216,
R Post SB 23-1208 For A/C 216-216,
R 25-23-42-991-001-A Fig. 401A
R **ON A/C ALL
3. Job Set-up__________
Subtask 25-23-42-861-050
A. Energize the ground service network (Ref. TASK 24-42-00-861-001)
EFF : ALL
25-23-42Page 401
Subtask 25-23-42-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LIGHT-CABIN ENTRY 308LG J04
R **ON A/C 216-216,
R Post SB 23-1208 For A/C 216-216,
R Subtask 25-23-42-865-057
R C. Open, safety and tag this(these) circuit breaker(s):
R R R R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU DOORS/CKPT/VIDEO/SPLY 15RA T16
R **ON A/C ALL
4. Procedure_________
Subtask 25-23-42-020-050
R A. Removal of the ceiling panel (1). (Ref. Fig. 401/TASK 25-23-42-991-001)
R (1) Hold the panel (1) in position and release the fasteners (15).
R (2) Carefully remove the panel (1).
Subtask 25-23-42-020-052
R B. Removal of the ceiling panel(s) (2) and/or (3). (Ref. Fig. 401/TASK 25-23-42-991-001)
NOTE : Special care must be used when removing the ceiling panel(s) (2)____ and/or (3), because the position of other furnishings decreases the available working area.
(1) Remove the assembly seal (13) from the mounting rail (14).
EFF : ALL
25-23-42Page 402
Feb 01/04
R R Ceiling Panels Forward Utility Area Figure 401/TASK 25-23-42-991-001
EFF : ALL 25-23-42 Page 403 Nov 01/02
CES
R (2) Hold the panel(s) (2) and/or (3) in position and release the
R fasteners (15).
R (3) Carefully remove the panel(s) (2) and/or (3).
R **ON A/C 216-216,
R Post SB 23-1208 For A/C 216-216,
R Subtask 25-23-42-020-050-A
R A. Removal of the ceiling panel (1).
R (Ref. Fig. 401A/TASK 25-23-42-991-001-A)
R CAUTION : DO NOT LET THE PANEL HANG ON THE ELECTRICAL WIRES. IF THE PANEL_______
R HANGS ON ELECTRICAL WIRES, IT CAN CAUSE DAMAGE TO THE
R ELECTRICAL EQUIPMENT.
R (1) Hold the panel (1) in position and release the fasteners (15).
R (2) Carefully lower the panel (1), disconnect the electrical connector
R (16) and remove the panel (1).
R (3) Put CAP - BLANKING, PLASTIC on the disconnected electrical connector.
R Subtask 25-23-42-020-052-A
R B. Removal of the ceiling panel(s) (2) and/or (3).
R (Ref. Fig. 401A/TASK 25-23-42-991-001-A)
R CAUTION : DO NOT LET THE PANEL HANG ON THE ELECTRICAL WIRES. IF THE PANEL_______
R HANGS ON ELECTRICAL WIRES, IT CAN CAUSE DAMAGE TO THE
R ELECTRICAL EQUIPMENT.
R NOTE : Special care must be used when removing the ceiling panel(s) (2)____
R and/or (3), because the position of other furnishings decreases
R the available working area.
R (1) Remove the assembly seal (13) from the mounting rail (14).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(10)