(b)
Remove the cap (3), the screws (4) and (1) and the washers (2).
(c)
Carefully tilt the lining to remove the nuts (22) and the socket (23).
(d)
Remove the lining 222RW.
EFF : ALL
25-23-45Page 419
May 01/05
R
CES TASK 25-23-45-400-007
Installation of the Door Frame Linings at the Right FWD Passenger/Crew Door
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-002 Installation of the Decals 20-21-11-911-001 Tightening Torques for Standard Threaded Fasteners 24-42-00-861-001 Energize the Ground Service Network from the External
Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
33-51-11-400-001 Installation of the Cabin Emergency Light
33-51-13-400-001 Installation of the Cabin Wall-Mounted
Emergency-Exit-Markers
33-51-16-400-001 Installation of the Emergency Exit Sign
R 35-23-00-710-001 Operational Check of Manual Mask Release 52-10-00-410-001 Closing of the Passenger/Crew Door AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25) 25-23-45-991-003-A Fig. 402
EFF : ALL
25-23-45Page 420
3. Job Set-up
__________
Subtask 25-23-45-860-051
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001)
(2)
Clean the component interface and/or the adjacent area.
(3)
Do an inspection of the component interface and/or the adjacent area.
(4)
Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-23-45-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU VACUUM CLEANER SOCKET-CABIN Z222 1ME A03
4. Procedure
_________
Subtask 25-23-45-420-058-A
A. Installation of the door frame linings 222RW, 222SW, 222TW, 222UW, 222VW
(Ref. Fig. 402/TASK 25-23-45-991-003-A) R
R (1) Unless specified, TORQUE all nuts, bolts and screws (Ref. TASK 20-21-11-911-001).
R (2) Install the lining 222RW:
(a)
Put the socket (23) in position and install the nuts (22).
(b)
Put the the lining 222RW in position.
(c)
Install the screws (1), (4) and the washers (2), but do not tighten the screws (1) and (4).
EFF : ALL
25-23-45Page 421
(d) Install the handgrip:
1_ Put the spacer (15) (if installed), the handgrip (14), the plates (13) and the screws (11) and (12) in position. TORQUE the screws (11) and (12) to 0.8 m.daN (70.79 lbf.in).
(e) Tighten the screws (1) and (4) and install the cap(s) (3).
(f) Install the handgrip cover (9). Make sure that the lugs (10) of the handgrip cover engage correctly. Press the handgrip cover into position until you hear a click.
R (3) Install the lining 222TW:
(a) Put the lining 222TW in position and install the screws (1) and (4), the washers (2) and the caps (3).
R (4) Install the lining 222VW:
(a) Put the lining 222VW in position and install the screws (1) and the washers (2).
R (5) Install the lining 222UW:
(a) Put the lining 222UW in position and install the screws (1) and the washers (2).
(b) Put the latch hook (18) in position and install the screws (16) and the washers (17).
(c) Install the handgrip:
1_ Put the spacer (15) (if installed), the handgrip (14), the plates (13) and the screws (11) and (12) in position. TORQUE the screws (11) and (12) to 0.8 m.daN (70.79 lbf.in).
2_ Install the handgrip cover (9). Make sure that the lugs (10) of the handgrip cover engage correctly. Press the handgrip cover into position until you hear a click.