• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 25-25-11-991-001 Fig. 401

 3. Job Set-up
__________
 Subtask 25-25-11-861-052

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 4. Procedure
_________ Subtask 25-25-11-020-050 R A. Removal of the Filler Panels: (Ref. Fig. 401/TASK 25-25-11-991-001) R (1) Remove the section hose (3) from the mounting rail (4).
 (2) Release and remove the filler panel (1).
 EFF : ALL
25-25-11Page 401


 Filler Panel
 Figure 401/TASK 25-25-11-991-001
 EFF :  ALL  25-25-11 Page 402 
May 01/00
 CES 

 

R R  (3) Loosen the screws (5), release and remove the class-divider-bracket (2). 
R  (4) If installed, and necessary open/remove the passenger service information units (PSIUs) as follows:
 (a) Remove the Loudspeakers (Ref. TASK 23-73-51-000-001).
 (b) Remove the No Smoking/Fasten Seat Belt Signs (Ref. TASK 23-73-63-000-001).
 (c) Remove the Reading Lights (Ref. TASK 23-73-64-000-001)
 (d) Remove the Individual Air outlet (Ref. TASK 21-24-19-000-001)
 (e) Remove the Emergency Oxygen Containers (Ref. TASK 35-21-41-000-001)

 EFF : ALL
25-25-11Page 403


 TASK 25-25-11-400-001
 Installation of the Filler Panel(s) of the Passenger Service/Information Unit(s) (PSIU)
 1. Reason for the Job
__________________
 Self explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
98A25207503000 1 PULLEY ASSEMBLY - SEALING CORD
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-24-19-400-001 Installation of the Individual Air outlet 4150 HM 23-73-51-400-002 Installation of the Loudspeaker 23-73-63-400-001 Installation of the No Smoking/Fasten Seat Belt
 (NS/FSB) Signs in the PSIU and the C/B panels 2000VU
 and 2001VU. 23-73-64-400-001 Installation of the Reading Light 24-42-00-861-001 Energize the Ground Service Network from the External
 Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 35-21-41-400-001 Installation of the Emergency Oxygen Containers 25-25-11-991-001 Fig. 401
 EFF : ALL
25-25-11Page 404


 3. Job Set-up__________
 Subtask 25-25-11-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
 (2) Clean the component interface and/or the adjacent area.
 (3) Do an inspection of the component interface and/or the adjacent area.
 (4) Make sure that the work area is clean and clear of tool(s) and other items.
 4. Procedure_________
 Subtask 25-25-11-420-050 
R  A. Installation of the Filler Panel(s): (Ref. Fig. 401/TASK 25-25-11-991-001)
 (1) If opened/removed install the passenger service/information units (PSIUs) as follows:
 (a) Install the Loudspeakers (Ref. TASK 23-73-51-400-002).
 (b) Install the No Smoking/Fasten Seat Belt Signs (Ref. TASK 23-73-63-400-001).
 (c) Install the Reading Lights (Ref. TASK 23-73-64-400-001).
 (d) Install the Emergency Oxygen Containers (Ref. TASK 35-21-41-400-001).
 (e) Install the Individual Air outlet 4150 HM(Ref. TASK 21-24-19-400-001).
 (2) Make sure that the work area is clean and clear of tool(s) and other items. 
R R  (3) Put the filler panel (1) in position and engage it to the mounting rail (4). 
R R  (4) Put the class-divider-bracket in position engage it to the mounting rail and tighten the screws (5).

 EFF : ALL
25-25-11Page 405


R R  (5) Install the related seal (3) to the mounting rail (4) , use the PULLEY ASSEMBLY - SEALING CORD (98A25207503000).
 NOTE : Make sure that the seal is not expanded.____
 NOTE : Make sure that there is a gap of 2.0 +0.0 -0.5 mm (0.79 +0.00____ -0.0196 in.) on both sides of the emergency oxygen container.
 5. Close-up________
 Subtask 25-25-11-862-053
 A. De-energize the ground service network (Ref. TASK 24-42-00-862-001).

 EFF : ALL
25-25-11Page 406


 CURTAINS AND PARTITIONS - DESCRIPTION AND OPERATION___________________________________________________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(65)