EFF : ALL
25-28-42Page 468
R (a) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (11).
R (b) Install the cover strip (12) with the screws (11).
R (8) Installation of the threshold (14):
R WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE_______
R THIS/THESE MATERIAL/S.
R USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
R (a) Apply SPECIAL MATERIALS (Material No. 05-002) to the screws (13).
R (b) Install the threshold (14) with the screws (13).
R (c) Apply a bead of sealant SEALANTS (Material No. 09-036) (15)
R around the threshold (14).
R 5. Close-up________
R Subtask 25-28-42-410-057
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Connect the electrical connectors of the floor path marking
R (Ref. TASK 33-51-12-400-001)
R Subtask 25-28-42-862-054
R B. De-energize the ground service network
R (Ref. TASK 24-42-00-862-001)
EFF : ALL
25-28-42Page 469
May 01/04
PROTECTION - FLOOR, MOISTURE BARRIER FOIL - REMOVAL/INSTALLATION
________________________________________________________________ TASK 25-28-43-000-001 Removal of Moisture Barrier Foil (MYLAR)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 SCRAPER - NON METALLIC
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power 25-28-41-000-001 Removal of the Textile Floor-Covering 25-28-42-000-001 Removal of the Non-Textile Floor Covering (NTF) 25-28-43-991-001 Fig. 401
EFF : ALL
25-28-43Page 401
3. Job Set-up
__________
Subtask 25-28-43-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 25-28-43-010-050
B. Get Access
(1)
Make sure that the Textile Floor Covering (Ref. TASK 25-28-41-000-001) and/or the Non-Textile Floor Covering (Ref. TASK 25-28-42-000-001) is removed.
(2)
Make sure that the area of the Moisture Barrier Foil (MYLAR) is free from equipment and furnishings.
4. Procedure
_________
Subtask 25-28-43-020-050
A. Removal of the Moisture Barrier Foil (MYLAR):
WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
_______ AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
(Ref. Fig. 401/TASK 25-28-43-991-001)
CAUTION : REMOVE THE FLOOR COVERING CAREFULLY TO PREVENT DAMAGE TO THE
_______
CABIN FLOOR PANELS.
EFF : ALL
25-28-43Page 402
(1) Remove the Moisture Barrier Foil (MYLAR) (3) from the floor panel (5). Use a SCRAPER - NON METALLIC to help the removal procedure.
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
(2)
Clean the component interface and/or the adjacent area with CLEANING AGENTS (Material No. 11-004).