(f)
Put the latch hook (18) in position and install the screws (16) and the washers (17).
EFF : ALL
25-23-45Page 444
R (3) Install the lining 262WW:
(a)
Put the the lining 262WW in position.
(b)
Install the screws (1), (4) and the washers (2), but do not tighten the screws (1) and (4).
(c)
Install the handgrip: 1 Put the spacer (15) (if installed), the handgrip (14), the
_ plates (13) and the screws (11) and (12) in position. TORQUE the screws (11) and (12) to 0.8 m.daN (70.79 lbf.in).
(d)
Tighten the screws (1) and (4) and install the cap(s) (3).
(e)
Install the handgrip cover (9). Make sure that the lugs (10) of the handgrip cover engage correctly. Press the handgrip cover into position until you hear a click.
R (4) Install the lining 262UW:
(a) Put the lining 262UW in position and install the screws (1) and the washers (2).
R (5) Install the lining 262VW:
(a)
Put the lining 262VW in position and install the screws (1), (4) and (8) and the washers (2) and (7), but do not tighten the screws (1), (4) and (8).
(b)
Make sure that there is a clearance of 2.0 +0.0 -0.5 mm (0.08 +0.00 -0.02 in.) at each side of the oxygen container doors (Ref. TASK 35-23-00-710-001).
(c)
Tighten the screws (1), (4) and (8) and install the caps (3).
(d)
Remove the blanking plugs from the line ends.
(e)
Connect the hose (5) and tighten the clamp (6).
(f)
Connect the electrical connector: 1 Remove the blanking caps from the electrical connectors.
_ 2 Make sure that the electrical connectors are clean and in the
_
correct condition.
EFF : ALL
25-23-45Page 445
3 Connect the electrical connector (19).
_
________
5. Close-up
Subtask 25-23-45-410-052
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the cabin wall-mounted emergency-exit-marker 90WL8 (Ref. TASK 33-51-13-400-001).
(3)
Install the cabin emergency light 32WL (Ref. TASK 33-51-11-400-001).
(4)
Install the emergency exit sign 44WL (Ref. TASK 33-51-16-400-001).
(5)
Close the AFT passenger/crew door, Zone 842 (Ref. TASK 52-10-00-410-001).
Subtask 25-23-45-210-071
B. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that all placards of the retained/new components are in the correct position and in good condition.
(4)
If necessary install new placards, refer to (Ref. TASK 11-00-00-400-002) and (Ref. AMM 11-32-25 P.Block 001)
Subtask 25-23-45-862-050
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
EFF : ALL
25-23-45Page 446
LINING - DOOR - REMOVAL/INSTALLATION
____________________________________
TASK 25-23-46-000-001
Removal of the Door Linings at the FWD Passenger/Crew Doors
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power
52-10-00-010-001 Opening of the Passenger/Crew Door
25-23-46-991-001 Fig. 401
FOR FIN 831AZ, 841AZ
R 25-62-44-000-002 Removal of the Escape-Slide Pack-Assembly
3. Job Set-up
__________
Subtask 25-23-46-861-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001)
EFF : ALL
25-23-46Page 401
Subtask 25-23-46-010-050
B. Get Access
(1)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(30)