1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-007 Installation of the ESSO (Scotchcal Labels) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
25-21-41-000-001 Removal of the Passenger Seats
25-21-41-400-001 Installation of the Passenger Seats
AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25)
**ON A/C 301-399,
25-27-46-991-001-A Fig. 401 R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
3. Job Set-up
__________
Subtask 25-27-46-860-050-A
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001)
(2)
Make sure that the doghouse is empty.
R EFF : 001-049, 101-149, 151-199, 201-299, 25-27-46Page 404 301-399, 401-499, Aug 01/05
CES
(3) Make sure that the seat-row forward of the doghouse is removed
(Ref. TASK 25-21-41-000-001)
_________
4. Procedure
Subtask 25-27-46-210-053
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
**ON A/C 301-399,
Subtask 25-27-46-420-050-A
B. Installation of the Doghouse(s)
(Ref. Fig. 401/TASK 25-27-46-991-001-A)
(1)
Put the seat track fittings (12) and the stoppers (11) in the seat tracks (13).
(2)
Put the doghouse (1) onto the seat track fittings (12) and the stoppers (11).
(3)
Install the washers (10) and the nuts (9) and tighten them.
(4)
Install the cover (4).
(5)
Put the drawer (2) on the guide rail (5), install the screws (6) and the washers (7) and tighten them.
(6)
Push the drawer (2) into the doghouse (1) until it stops.
(7)
Make sure that the drawer latch (3) is correctly engaged.
(8)
Close the drawer lock (8).
R EFF : 001-049, 101-149, 151-199, 201-299, 25-27-46Page 405 301-399, 401-499, Aug 01/05
CES
R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
5. Close-up
________
Subtask 25-27-46-410-051-A
A. Close Access
(1)
Install the seatrow forward of the doghouse (Ref. TASK 25-21-41-400-001).
(2)
Install the equipment in the doghouse, as identified during the removal procedure.
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
(4)
Make sure that all of the placards of the retained/new components are in the correct position and in a good condition.
(5)
If necessary install new placards (Ref. TASK 11-00-00-400-007) and (Ref. AMM 11-32-25 P.Block 001).
Subtask 25-27-46-862-050-A
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
R EFF : 001-049, 101-149, 151-199, 201-299, 25-27-46Page 406 301-399, 401-499, Aug 01/05
CES **ON A/C 151-199,
TASK 25-27-46-400-002
Installation of a Doghouse MID
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-004 USA MIL-PRF-23827 TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
Material No. 11-003 USA ASTM D 740
METHYL-ETHYL-KETONE (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(95)