• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE
_______ R MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
 WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
_______ AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
 CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
_______ THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
 (Ref. Fig. 405/TASK 25-23-43-991-005)
 (1) Examine the markings on the LH and RH sidewall-panels at FR35/FR35.8 to FR36 and FR46 to FR47.
 NOTE : These markings (brown triangles) identify the windows through
____ which the flight crew can look at the external slat/flap position markings.
 (2)
 Make sure that the markings on the LH and RH sidewall-panels for FR35/FR53.8 to FR36 and FR46 to FR47 are in a good condition.

 (3)
 If necessary, install new placards or paint new markings on the sidewall-panels.

 (4)
 Solution with a painted marking:

 (a)
 Clean the area (Ref. TASK 12-21-12-100-004).

 (b)
 Measure the distances and make marks as shown in (DETAIL "B").

 


 EFF : ALL


25-23-43Page 410


 Panel 3-Frame - Identification Marking Figure 405/TASK 25-23-43-991-005
R  EFF : CES  ALL  25-23-43 Page 411 Aug 01/05 

 

 (c)
 Apply masking tape to the area adjacent to the marks you have made.

 (d)
 Paint a new marking to the sidewall-panel and use STRUCTURE PAINTS (Material No. 16-047)


 (5) Solution with a placard:
 (a)
 Clean the area (Ref. TASK 12-21-12-100-004).

 (b)
 Measure the distances and make marks as shown in (DETAIL "C").

 (c)
 Install the new placard (30) adjacent to the marks you have made (Ref. TASK 11-00-00-400-007) (Ref. AMM 11-32-25 P.Block 001).


 Subtask 25-23-43-420-050
 C. Installation of a 3-Frame Sidewall-Panel
 (Ref. Fig. 401/TASK 25-23-43-991-001)

 NOTE : The installation procedure is applicable for the LH and RH
____
 sidewall-panels.

 (1)
 Put the sidewall-panel (1) in position as recorded in the removal procedure.

 (2)
 Move the sidewall-panel (1) down and engage the yo-yo rollers in the brackets.

 (3)
 Put the lining strips (2) up between the sidewall-panel (1) and the adjacent panels, and make sure that they are correctly engaged.


 (4) Make sure that the sidewall-panels are aligned to each other. R (5) Install the washers (3), (4) and the screws (5).
 (6) Clean the decor-panel (Ref. TASK 12-21-12-100-004).
R (7) Put the decor-panel (6) and the decor-cover (7) in position and make R sure that the decor-cover (7) is correctly engaged.
 EFF : ALL

25-23-43Page 412


 Subtask 25-23-43-420-051
 D. Installation of a 2-Frame Sidewall-Panel with a Seal attached
 (Ref. Fig. 402/TASK 25-23-43-991-004)

 NOTE : The installation procedure is applicable for the LH and RH
____
 sidewall-panels.

 (1)
 Put the sidewall-panel (1) in position as recorded in the removal procedure.

 (2)
 Move the sidewall-panel (1) down and engage the yo-yo rollers in the brackets.

 (3)
 Push the lining strip (2) up between the sidwall-panel (1) and the adjacent panel and make sure that they are correctly engaged.

 (4)
 Make sure that the sidewall-panels are aligned to each other.


 (5) Install the screws (4) and the washers (3). Subtask 25-23-43-420-053
 E. Installation of a 3-Frame End-Panel
 (Ref. Fig. 403/TASK 25-23-43-991-007)

 NOTE : The installation procedure is applicable for the LH and RH
____
 sidewall-panels.

 (1)
 Put the sidewall-panel (1) in position as recorded in the removal procedure.

 (2)
 Move the sidewall-panel (1) down and engage the yo-yo rollers in the brackets.

 (3)
 Put the lining strips (2) up between the sidewall-panel (1) and the adjacent panels, and make sure that they are correctly engaged.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(17)