EFF : ALL
25-24-00Page 507
Feb 01/05
R R Adjustment of the Overhead Stowage-Compartment (OHSC) Figure 502/TASK 25-24-00-991-002
EFF : ALL 25-24-00 Page 508 Feb 01/05
CES
R (c) Turn the turnbuckle body (6) clockwise or counterclockwise until
R the distance A is in the limits given in the table (view C).
R (d) Tighten the lock-nut (5).
R 5. Close-up________
R Subtask 25-24-00-410-051
R A. Close Access
R (1) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R (2) Install cove light panel (Ref. TASK 25-23-48-400-001).
R (3) If necessary, tighten the attached parts of the OHSC (Ref. TASK 25-
R 24-41-400-001).
R Subtask 25-24-00-862-051
R B. De-energize the ground service network
R (Ref. TASK 24-42-00-862-001).
EFF : ALL
25-24-00Page 509
Feb 01/05
COMPARTMENT - SIDEWALL OVERHEAD STOWAGE - REMOVAL/INSTALLATION
______________________________________________________________
TASK 25-24-41-000-001
Removal of the Overhead Stowage Compartments
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) R No specific 1 STEPLADDER 1.0 M (3.3 FT)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-24-19-000-001 Removal of the Individual Air Outlet 4150 HM 24-42-00-861-001 Energize the Ground Service Network from the External
Power
25-23-41-000-001 Removal of the Ceiling Panels
25-23-48-000-001 Removal of the Cove Light Panels
25-25-11-000-001 Removal of the Filler Panel(s) of the Passenger
Service/Information Unit(s) (PSIU)
33-21-11-000-001 Removal of the Ballast Unit and Lampholder 1LG1
(3LG1)
35-21-41-000-001 Removal of the Emergency Oxygen Containers
25-24-41-991-001 Fig. 401
25-24-41-991-005 Fig. 402
25-24-41-991-012 Fig. 403
25-24-41-991-013 Fig. 404
EFF : ALL
25-24-41Page 401
3. Job Set-up
__________
Subtask 25-24-41-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 25-24-41-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU CABIN LIGHT POWER-WINDOW FWD 300LG H01
2000VU CABIN LIGHT POWER-WINDOW AFT 301LG H03
2000VU CABIN LIGHT POWER-WINDOW AFT 302LG H04
2000VU CABIN LIGHT POWER-WINDOW FWD 303LG H02
2000VU CABIN LIGHT POWER-CEILING AFT 304lG H07
2000VU CABIN LIGHT POWER-CEILING FWD 305LG H05
2000VU CABIN LIGHT POWER-CEILING FWD 306LG H06
2000VU CABIN LIGHT POWER-CEILING AFT 307LG H08
Subtask 25-24-41-010-050-A
C. Get Access
R (1) Put a STEPLADDER 1.0 M (3.3 FT) adjacent to the stowage compartment R you will remove.
(2)
Make sure that the stowage compartment is empty.
(3)
Remove the ceiling panels adjacent to the stowage compartment (Ref. TASK 25-23-41-000-001).
(4)
Remove the cove light panels adjacent to the stowage compartment (Ref. TASK 25-23-48-000-001).