Emergency-Exit-Markers
33-51-16-400-001 Installation of the Emergency Exit Sign
35-21-41-400-001 Installation of the Emergency Oxygen Containers
35-23-00-710-001 Operational Check of Manual Mask Release
AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25)
25-23-45-991-004-A Fig. 403
EFF : ALL
25-23-45Page 432
3. Job Set-up
__________
Subtask 25-23-45-860-054
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001)
(2)
Clean the component interface and/or the adjacent area.
(3)
Do an inspection of the component interface and/or the adjacent area.
(4)
Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-23-45-865-058
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU VACUUM CLEANER SOCKET-CABIN Z222 5ME F01
4. Procedure
_________
Subtask 25-23-45-560-050
A. Preparation for Installation
(1) Install the emergency oxygen container (Ref. TASK 35-21-41-400-001) on the door frame lining 261VW.
Subtask 25-23-45-420-060-A
B. Installation of the door frame linings 261WW, 261TW, 261UW, 261VW
(Ref. Fig. 403/TASK 25-23-45-991-004-A) R
R (1) Unless specified, TORQUE al nuts, bolts and screws (Ref. TASK 20-21-11-911-001).
EFF : ALL
25-23-45Page 433
R (2) Install the lining 261TW:
(a)
Put the socket (23) in position and install the nuts (22).
(b)
Put the the lining 261TW in position.
(c)
Install the screws (1), (4) and the washers (2), but do not tighten the screws (1) and (4).
(d)
Install the handgrip: 1 Put the spacer (15) (if installed), the handgrip (14), the
_ plates (13) and the screws (11) and (12) in position. TORQUE the screws (11) and (12) to 0.8 m.daN (70.79 lbf.in).
(e)
Tighten the screws (1) and (4) and install the cap(s) (3).
(f)
Install the handgrip cover (9). Make sure that the lugs (10) of the handgrip cover engage correctly. Press the handgrip cover in position until you hear a click.
(g)
Put the latch hook (18) in position and install the screws (16) and the washers (17).
R (3) Install the lining 261WW:
(a)
Put the the lining 261WW in position.
(b)
Install the screws (1), (4) and the washers (2), but do not tighten the screws (1) and (4).
(c)
Install the handgrip: 1 Put the spacer (15) (if installed), the handgrip (14), the
_ plates (13) and the screws (11) and (12) in position. TORQUE the screws (11) and (12) to 0.8 m.daN (70.79 lbf.in).
(d)
Tighten the screws (1) and (4) and install the cap(s) (3).
(e)
Install the handgrip cover (9). Make sure that the lugs (10) of the handgrip cover engage correctly. Press the handgrip cover into position until you hear a click.
R (4) Install the lining 261UW:
(a) Put the lining 261UW in position and install the screws (1) and the washers (2).
EFF : ALL
25-23-45Page 434
R (5) Install the lining 261VW:
(a)
Put the lining 261VW in position and install the screws (1), (4) and (8) and the washers (2) and (7), but do not tighten the screws (1), (4) and (8).
(b)
Make sure that there is a clearance of 2.0 +0.0 -0.5 mm (0.08 +0.00 -0.02 in.) at each side of the oxygen container doors (Ref. TASK 35-23-00-710-001).
(c)
Tighten the screws (1), (4) and (8) and install the caps (3).
(d)
Remove the blanking plugs from the line ends.
(e)
Connect the hose (5) and tighten the clamp (6).
(f)
Connect the electrical connector: 1 Remove the blanking caps from the electrical connectors.
_ 2 Make sure that the electrical connectors are clean and in the
_
correct condition.
3 Connect the electrical connector (19).
_
5. Close-up
________
Subtask 25-23-45-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(27)