(b)
Torque the screws (42) to between 0.80 and 0.90 m.daN (70.79 and
79.64 lbf. in)
(c)
Torque the nuts (40) to between 0.70 and 0.80 m.daN (61.94 and
70.79 lbf. in)
(d)
Put the turnbuckles in position and install the pins (18) and (21), the washers (19) and the lock-pins (20).
(e)
Install the screws (29), the washers (30), (31) and the nuts (32).
(f)
Torque the nuts (32) to between 0.70 and 0.80 m.daN (61.94 and
70.79 lbf. in)
(g)
Put the bonding-strap (6) in position and install the screw (46), the washer (47) and the nut (48). (Ref. TASK 20-28-00-912-004)
(h)
Install the panel (2) on the attachment rail (1) and push it onto the handrail.
(i)
If necessary, connect the hoses (4) and install the clamps (3). NOTE : The cabin sensor temperature casing (3) is installed
____ between two overhead stowage compartments (1) and (2). If you install one or more of these overhead stowage comartments (1) and/or (2), do these steps:
(Ref. Fig. 402/TASK 25-24-41-991-005)
(j)
Connect the hose (6) to the outlet pipe of the cabin temperature sensor (4) and tighten the clamp (5).
(k)
Install the screen (8), the screws (7) on the sidewalls of the overhead stowage compartments (1) and (2).
EFF : ALL
25-24-41Page 413
May 01/04
R
CES Subtask 25-24-41-420-051
B. Installallation of the 1-frame stowage compartments/spacer bins.
(Ref. Fig. 403/TASK 25-24-41-991-012)
(1) Install the upper attachments.
(a) Put the stowage/spacer bin in position and install the pin (7) (Ref. Detail "B"), the screws (24) (Ref. Detail "G") and (36) (Ref. Detail "A") and the washers (25), (26) and (28).
NOTE : You must install the washers as recorded in the removal
____
procedure.
(b)
Install the washers (8), (25) and (26), the split-ring (9) and the nut(s) (27).
(c)
Install the screws (44) and the washers (45).
(d)
Torque the screws (44) to between 0.80 and 0.90 daNm (70.79 and
79.64 lbf. in)
(2) Install the lower attachments.
(a)
Install the screws (37), the washers (38) and (39) and the nuts (40).
(b)
Torque the nuts (40) to between 0.70 and 0.80 daNm (61.94 and
70.79 lbf. in)
(c)
Put the turnbuckles in position and install the pins (18), the washers (19) and the pin-locks (20).
(d)
Install the screws (51), the washers (52) and (53) and the nuts (54).
(e)
Torque the nuts (54) to between 0.70 and 0.80 daNm (61.94 and
70.79 lbf. in)
(f)
Put the bonding-strap (6) in position and install the screw (46), the washer (47) and the nut (48) (Ref. TASK 20-28-00-912-004).
EFF : ALL
25-24-41Page 414
May 01/04
R
CES Subtask 25-24-41-420-052
C. Installation of the spacer bin FR38/FR39.
(Ref. Fig. 404/TASK 25-24-41-991-013)
(1) Put the spacer bin in position and install the pin (7), the screw
(24) and the washers (25), (26) and (28).
NOTE : You must install the washers as recorded in the removal
____
procedure.
(2)
Install the washers (8) and (28), the split-ring (9) and the nut (27).
(3)
Install the screws (22), the washers (23) and (49) and the nuts (50).
(a) Torque the nuts (50) to between 0.70 and 0.80 daNm (61.94 and
70.79 lbf. in)
(4)
Put the turnbuckles in position and install the pins (18), the washers (19) and the pin-locks (20).
(5)
Install the screws (29), the washers (30) and (31) and the nuts (32).
(a) Torque the nuts (32) to between 0.70 and 0.80 daNm (61.94 and
70.79 lbf. in)
(6)
Put the bonding-strap (6) in position and install the srew (46), the washer (47) and the nut (48) (Ref. TASK 20-28-00-912-004).
Subtask 25-24-41-820-051
D. Adjustment of the Overhead Stowage Compartments
(1) If necessary, adjust the distance between a/c structure and OHSC (Ref. TASK 25-24-00-710-002).
5. Close-up
________ Subtask 25-24-41-410-050-A
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(61)