(6)
Connect the electrical connector (15).
(7)
Push the ceiling panel(s) (3) and/or (4) up and attach the safety strap (13) to the bracket (16).
(8)
Close the ceiling panel(s) (3) and/or (4) and hold in position.
(9)
Push in the fasteners (9) that are attached to the ceiling panel(s)
(3) and/or (4).
(10) Make sure the fasteners (9) are flushed with the celing panels. Subtask 25-23-42-420-055
C. Installation of the ceiling panel(s) (2) and/or (5)
(1)
Hold the ceiling panel(s) (2) and/or (5) and carefully push the assembly brackets (10) into the mounting slots (11).
(2)
Carefully move the ceiling panel(s) (2) and/or (5) outboard and attach them on the mounting rail (8).
(3)
Install the assembly seal (7) into the mounting rail (8). Use the PULLEY ASSEMBLY - SEALING CORD (98A25207503000)
5. Close-up
________ Subtask 25-23-42-865-055
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 308LG
Subtask 25-23-42-710-051
B. Do the operational test on the ceiling lights in the aft utility area (Ref. TASK 33-21-00-710-001).
Subtask 25-23-42-862-051
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
EFF : ALL
25-23-42Page 424
PANELS - UPPER SIDEWALL - REMOVAL/INSTALLATION______________________________________________
TASK 25-23-43-000-001
Removal of the Upper Sidewall Panel(s)
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific small screw-driver
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 25-23-43-991-001 25-23-43-991-004 25-23-43-991-007 25-23-43-991-008 Energize the Ground Service Network from the External PowerFig. 401Fig. 402Fig. 403Fig. 404
3. Job Set-up__________
Subtask 25-23-43-861-050
A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
R Subtask 25-23-43-010-051
R B. Get Access
R R (1) Fold down the backrests of the passenger-seats in the area where you want to remove the sidewall-panel (1).
EFF : ALL
25-23-43Page 401
4. Procedure_________
Subtask 25-23-43-020-050
A. Removal of a 3-Frame Sidewall-Panel (Ref. Fig. 401/TASK 25-23-43-991-001)
NOTE : The removal procedure is applicable for the LH and RH____ sidewall-panels.
(1) Record the location of the sidewall-panel(s) (1) you want to remove.
R R (2) With a small screw-driver push the clips in the holes of the decor-cover (7) to release the decor-cover (7).
R (3) Remove the decor-cover (7) and the decor-panel (6).
R (4) Remove the screws (5) and the washers (3) and (4).
(5) Pull the lining strips (2) down and out from between the sidewall-panel (1) and the adjacent panels.
(6) Lift the sidewall-panel (1), release the yo-yo roller from the brackets and remove it.
Subtask 25-23-43-020-052
B. Removal of a 2-Frame Sidewall-Panel attached with a Seal (Ref. Fig. 402/TASK 25-23-43-991-004)
NOTE : The removal procedure is applicable for the LH and RH____ sidewall-panels.
(1) Record the location of the sidewall-panel(s) (1) you want to remove.
(2) Remove the screws (4) and the washers (3).
(3) Pull the lining strips (2) down and out from between the sidewall panel (1) and the adjacent panel.
(4) Lift the sidewall-panel (1), release the yo-yo roller from the brackets and remove it.
EFF : ALL
25-23-43Page 402
Panel 3-Frame
Figure 401/TASK 25-23-43-991-001
EFF : ALL 25-23-43 Page 403
Feb 01/98
CES
Panel 2-Frame with a Seal
Figure 402/TASK 25-23-43-991-004
EFF : ALL 25-23-43 Page 404
Feb 01/98
CES
Subtask 25-23-43-020-054
C. Removal of a 3-Frame Sidewall End-Panel
(Ref. Fig. 403/TASK 25-23-43-991-007)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(15)