25-23-45Page 410
R (6) Install the lining 221AW:
(a) Put the lining 221AW in position and engage the attach brackets (24) in the yo-yo rolls (25).
(b) Install the screws (27) and the washers (26).
R (7) Install the lining 221BW:
(a) Put the lining 221BW in position and install the screws (1), (27) and (30) and the washers (2), (26) and (31).
R (8) Install the lining 221EW:
(a) Put the lining 221EW in position and engage the attach brackets (24) in the yo-yo rolls (25).
(b) Install the screws (27) and the washers (26).
(c) Install the handgrip:
1_ Put the spacer (15) (if installed), the handgrip (14), the plates (13) and the screws (11) and (12) in position. TORQUE the screws (11) and (12) to 0.8 m.daN (70.79 lbf.in).
2_ Install the handgrip cover (9). Make sure that the lugs (10) of the handgrip cover engage correctly. Press the handgrip cover into position until you hear a click.
R (9) Install the lining 221SW:
(a) Put the lining 221SW in position and install the screws (1), (4) and (8), the washers (2) and (7), but do not tighten the screws (1), (4) and (8).
(b) Make sure that there is a clearance of 2.0 +0.0 -0.5 mm (0.08 +0.00 -0.02 in.) at each side of the oxygen container doors (Ref. TASK 35-23-00-710-001).
(c) Tighten the screws (4) and (8) and install the caps (3).
(d) Remove the blanking plugs from the line ends.
(e) Connect the hose (5) and tighten the clamp (6).
EFF : ALL
25-23-45Page 411
(f) Connect the electrical connectors: 1 Remove the blanking caps from the electrical connectors.
_ 2 Make sure that the electrical connectors are clean and in the
_
correct condition.
3 Connect the electrical connector (19).
_
Subtask 25-23-45-942-054
B. Remove the warning notices from the panels 25VU and 120RH.
Subtask 25-23-45-865-060
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
49VU LIGHTING/EMER LT/CABIN 1WL H05 49VU LIGHTING/EMER LT/CABIN 2WL H06 122VU LIGHTING/CABIN/EMER/LT 3WL V07
Subtask 25-23-45-710-056
R D. Do the operational test of the cabin emergency lighting (Ref. TASK 33-51-R 00-710-008).
5. Close-up
________
Subtask 25-23-45-410-053
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the cabin wall-mounted emergency-exit marker 90WL1 (Ref. TASK 33-51-13-400-001).
(3)
Install the cabin emergency light 21WL (Ref. TASK 33-51-11-400-001).
(4)
Install the emergency exit sign 41WL (Ref. TASK 33-51-16-400-001).
(5)
Close the FWD passenger/crew door, Zone 831 (Ref. TASK 52-10-00-410-001).
EFF : ALL
25-23-45Page 412
Subtask 25-23-45-210-068
B. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that all placards of the retained/new components are in the correct position and in good condition.
(4)
If necessary install new placards, refer to (Ref. TASK 11-00-00-400-002) and (Ref. AMM 11-32-25 P.Block 001)
Subtask 25-23-45-862-051
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
EFF : ALL
25-23-45Page 413
Feb 01/03
R
CES TASK 25-23-45-000-002
Removal of the Door Frame Linings at the Right FWD Passenger/Crew Door
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(22)