NOTE : The procedure to install all the curtain rail(s) is the same.
____
(1)
Put the strap(s) (6) and the washer(s) (8) in position and install the screw(s) (7).
(2)
Put the brackets (4) in position and install the screws (5).
(3)
Put the fittings (3) in position.
(4)
Put the curtain rail(s) (1) in position and install the screws (2).
R EFF : 001-049, 101-105, 151-199, 201-210, 25-26-41Page 423 301-399, May 01/05
CES **ON A/C ALL
5. Close-up
________ Subtask 25-26-41-410-061
A. Close Access
(1)
Install the AFT Curtains (Ref. TASK 25-26-41-400-013)
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Make sure that all of the placards of the retained/new components are in the correct position and in a good condition.
(4)
If necessary install new placards (Ref. TASK 11-00-00-400-007) and (Ref. AMM 11-32-25 P.Block 001).
Subtask 25-26-41-862-052
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
EFF : ALL
25-26-41Page 424
Feb 01/05
R
CES TASK 25-26-41-000-013 Removal of the Curtains
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-26-41-991-016-A Fig. 403
3. Job Set-up
__________ Subtask 25-26-41-861-055
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 25-26-41-010-073
B. Get Access
(1) Get access to the cabin.
4. Procedure
_________ Subtask 25-26-41-020-076
A. Removal of the curtain(s):
(Ref. Fig. 403/TASK 25-26-41-991-016-A)
(1) Removal of the curtains from the curtain rails.
(a)
Remove the screw(s) (3), the cover plate(s) (4) and the cover clip(s) (6) (if installed).
(b)
Release the end stop(s) (5).
EFF : ALL
25-26-41Page 425
Feb 01/05
R
CES
Curtains Figure 403/TASK 25-26-41-991-016-A
R EFF : CES ALL 25-26-41 Page 426 Feb 01/05
(c) Move the curtain (2) with the gliders (7) and the end stop(s) (5)
out of the curtain rail(s) (1).
EFF : ALL
25-26-41Page 427
TASK 25-26-41-400-013 Installation of the Curtains
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-007 Installation of the ESSO (Scotchcal Labels) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25) 25-26-41-991-016-A Fig. 403
3. Job Set-up
__________ Subtask 25-26-41-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
4. Procedure
_________ Subtask 25-26-41-210-067
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
EFF : ALL
25-26-41Page 428
Subtask 25-26-41-420-076
B. Installation of the curtain(s):
(Ref. Fig. 403/TASK 25-26-41-991-016-A)
(1) Install the curtain(s).
(a)
Engage the gliders (7) with the curtain(s) (2) into the curtain rail(s) (1).
(b)
Install and lock the end stop(s) (5).
(c)
Install the cover clip(s) (6) and the cover plate(s) (4) with the screw(s) (3) ( if removed).