24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 25-21-41-400-001 Installation of the Passenger Seats R 25-27-46-991-005 Fig. 402


 3. Job Set-up
__________
 Subtask 25-27-46-860-052
 A. Aircraft Maintenance Configuration
 Make sure that the ground service network is energized
 (Ref. TASK 24-42-00-861-001)

 (1) Make sure that the doghouse is empty.
 4. Procedure
_________
 Subtask 25-27-46-210-050
 A. Preparation for Installation
 (1) Clean the seat tracks.
 WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
_______ AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
 (a) Clean the seat tracks with CLEANING AGENTS (Material No. 11-003) and MISCELLANEOUS (Material No. 19-003).
 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Do an inspection of the component interface and/or the adjacent area.

 (4)
 Make sure that the parts retained from the removed component are clean and in the correct condition.


 EFF : 151-199, 25-27-46Page 408

Feb 01/05
R
 CES  Subtask 25-27-46-420-052


 B. Installation of the Doghouse(s). R (Ref. Fig. 402/TASK 25-27-46-991-005)
 (1)
 Apply COMMON GREASE (Material No. 04-004) to the seat track fittings (9).

 (2)
 Put the doghouse (1) in position.

 (3)
 Pull the lever (6) and move it to the aft direction.

 (4)
 Turn the lever (6) to the locked position.

 (5)
 Install the cover (5).

 (6)
 Install the drawer (2) on the guiderail (3) and lock it with the disconnect knobs (4).

 (7)
 Push the drawer (2) into the doghouse (1) until it stops and lock it with the latch (10).


 5. Close-up
________
 Subtask 25-27-46-410-052

 A. Close Access
 (1)
 Install the seatrow forward of the doghouse (Ref. TASK 25-21-41-400-001).

 (2)
 Install the equipment in the doghouse, as identified during the removal procedure.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.


 Subtask 25-27-46-862-051
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)

 

R  Doghouse Floor Mouted Figure 402/TASK 25-27-46-991-005 
R  EFF :  151-199,  25-27-46 Page 410 Feb 01/05
 CES 

 

 **ON A/C 151-199, 201-210,
 TASK 25-27-46-000-004
 Removal of a Doghouse AFT
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 25-21-41-000-001 Removal of the Passenger Seats
R  **ON A/C 201-210,
R  25-27-46-991-007 Fig. 403 **ON A/C 151-199, 201-210,
 3. Job Set-up
__________
 Subtask 25-27-46-861-053

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 25-27-46-010-054
 B. Get Access
 (1)
 Record and remove the equipment which is kept in the doghouse.

 (2)
 Remove the seatrow forward of the doghouse (Ref. TASK 25-21-41-000-001).

 


 4. Procedure
_________
 **ON A/C 151-199,

 Subtask 25-27-46-020-054
 A. Removal of the Doghouse 6600MM
 (1)
 Release the drawer lock (11) and pull the drawer (2) until it stops.

 (2)
 Push the disconnect knobs (4) and remove the drawer (2) from the guiderail (3).
 