• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
11-00-00-400-002 Installation of the Decals 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power
 AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25)
 25-23-46-991-001 Fig. 401
 FOR FIN 831AZ, 841AZ

R  25-62-44-400-001 Installation of the Escape-Slide Pack-Assembly 52-10-00-410-001 Closing of the Passenger/Crew Door
 3. Job Set-up
__________
 Subtask 25-23-46-860-051
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001)
 EFF : ALL

25-23-46Page 408


 Subtask 25-23-46-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05
 4. Procedure
_________ (Ref. Fig. 401/TASK 25-23-46-991-001) WARNING : MAKE SURE THE PERCUSSION LEVER OF THE DOOR DAMPER CYLINDER IS IN
_______
 THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.

 Subtask 25-23-46-210-054
 A. Preparation for Installation
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Make sure that all placards of the retained/new components are in the correct position and in good condition.

 (4)
 If necessary install new placards, refer to (Ref. TASK 11-00-00-400-002) and (Ref. AMM 11-32-25 P.Block 001)


 Subtask 25-23-46-420-050
 B. Install the linings
 (1) Install the lining 831AZ (841AZ) (11)
 (a) Engage the lining (11) to the yo-yo rolls and install the washers
 (3) and the screws (4).
 EFF : ALL

25-23-46Page 409
Nov 01/00
R
 CES


 (2) Install the linings 831BZ (841BZ) (10) and 831DZ (841DZ) (21)
 (a) Engage the linings (10) and (21) to the yo-yo rolls and install the washers (3) and the screws (4).
 NOTE : Make sure that you can move the door window-shade
____
 correctly.

 (3) Install the handgrip
 (a)
 Put the lining (20) in position.

 (b)
 Install the spacer (19), the handgrip (24), the washers (18) and the screws (17) and (23).


 NOTE : TORQUE the screws to between 0.8 and 0.9 m.daN (70.79 and
____ 79.64 lbf.in).
 (c) Install the grip cover (22) to the handgrip (24). NOTE : Make sure that the lugs (28) of the grip cover (22) engage
____ correctly up until you hear a click.
 (4) Install the lining 831CZ (841CZ) (1)
 (a)
 Engage the lining (1) to the yo-yo rolls and install the washers

 (3) and the screws (4).

 (b)
 Put the handle plate (14) of the emergency control handle (16) in position and install the screw (15), the washer (13) and the nut (12),


 NOTE : Make sure that the handle plate is installed so that the
____ emergency control handle will contract into the recess in the door panel.
 (5)
 Install the lining 831EZ (841EZ) (2)

 (a) Engage the lining (2) to the yo-yo rolls and install the washers
 (3) and the screws (4).

 (6)
 Install the lining 831GZ (841GZ) (9)


 (a) Put the lining (9) in position and install the pin (5). R (b) Safety the pin (5) with a new cotter pin (6).
 EFF : ALL

25-23-46Page 410


 (c) Connect the rod (7) to the lining (9).
 (7)
 Install the lining 831FZ (841FZ) (8)

 (a)
 Put the lining (8) in position.

 (b)
 Turn the brackets into position and install the washers (3) and the screws (4).

 (c)
 Tighten the screws (4).

 

 (8)
 Put the grip (27) in position and install the washers (25) and the screws (26).


 5. Close-up
________ Subtask 25-23-46-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(32)