NOTE : The removal procedure is applicable for the LH and RH
____
sidewall-panels.
(1)
Record the location of the sidewall-panel(s) (1) you want to remove.
(2)
With a small screw-driver push the clips in the holes of the decor-cover (6) to release the decor-cover (6).
(3)
Remove the decor-cover (6) and the decor-panel (5).
(4)
Remove the screws (4) and the washers (3).
(5)
Remove the caps (8) and the screws (7).
(6)
Pull the lining strip (2) down and out from between the
sidewall-panel (1) and the adjacent panel.
(7)
Lift the sidewall-panel (1), release the yo-yo roller from the brackets and remove it.
Subtask 25-23-43-020-055
D. Removal a 2-Frame Filler Sidewall-Panel
(Ref. Fig. 404/TASK 25-23-43-991-008)
NOTE : The removal procedure is applicable for the LH and RH sidewall
____
panels.
(1)
Record the location of the sidewall-panel(s) (1) you want to remove.
(2)
Remove the caps (3) and the screws (4).
(3)
Pull the lining strip (2) down and out from between the
sidewall-panel (1) and the adjacent panels.
(4)
Lift the sidewall-panel (1), release the yo-yo roller from the brackets and remove it.
EFF : ALL
25-23-43Page 405
Aug 01/05
R
CES
Panel 3-Frame End
Figure 403/TASK 25-23-43-991-007
EFF : ALL 25-23-43 Page 406
Feb 01/98
CES
Panel 2-Frame Filler
Figure 404/TASK 25-23-43-991-008
EFF : ALL 25-23-43 Page 407
Feb 01/98
CES
TASK 25-23-43-400-001
Installation of the Upper Sidewall Panel(s)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific masking tape
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 16-047 F ASNA3687 DECORATIVE PAINT (INTERNAL APPLIC.) (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
30 placard 25-23-43 80 -010
EFF : ALL
25-23-43Page 408
Aug 01/05
R
CES D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
11-00-00-400-007 Installation of the ESSO (Scotchcal Labels) R 12-21-12-100-004 Cleaning of the Plastic Surfaces and Mirrors 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25)
25-23-43-991-001 Fig. 401
25-23-43-991-004 Fig. 402
25-23-43-991-007 Fig. 403
25-23-43-991-008 Fig. 404
25-23-43-991-005 Fig. 405
3. Job Set-up
__________
Subtask 25-23-43-860-051
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the backrests of the passenger seats, in the area where you removed the sidewall panel(s), are folded down.
4. Procedure
_________
Subtask 25-23-43-210-051
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
EFF : ALL
25-23-43Page 409
Subtask 25-23-43-560-050
B. Preparation of Component Replacement
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(16)