• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 Subtask 25-23-47-020-119
 E. Removal of the Door Lining 843HZ (844HZ) (834HZ) (4)
 (Ref. Fig. 404/TASK 25-23-47-991-015)

 (1)
 Remove the screws (10) and the washers (11).

 (2)
 Remove the screws (14) and pull the door lining (4) down to release the engage brackets from the yo-yo rolls and remove it.

 


 Door Linings.
 Figure 404/TASK 25-23-47-991-015- 12 (SHEET 1)

 CES


 Door Linings.
 Figure 404/TASK 25-23-47-991-015- 22 (SHEET 2)

 CES  TASK 25-23-47-400-013


 Installation of the Door Linings of the RH FWD Emergency Exit Door at zone 251, or RH AFT at zone 252, or LH AFT at zone 232.
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
11-00-00-400-002  Installation of the Decals
 24-42-00-861-001  Energize the Ground Service Network from the External Power
 24-42-00-862-001  De-energize the Ground Service Network Supplied from the External Power
 52-22-00-010-001  Opening of the Emergency Exit Doors from the Passenger Compartment
 52-22-00-410-001  Closing of the Emergency Exit Doors from the Passenger Compartment
 52-73-21-400-003  Installation of the SLIDE ARMED Indicator-Light (2WN1, 2WN2, 21WN1, 21WN2) of the Emergency Exit
 52-73-22-400-003  Installation of the CABIN PRESSURE Warning Light Panel of the Emergency Exit Door (19WN1,19WN2,20WN1,20WN2)
 AMM 11-32-25 P.Block 001 INTERIOR PLACARDS (SEE ALSO 11-42-25)
 25-23-47-991-015  Fig. 404
 3. Job Set-up__________
 Subtask 25-23-47-860-069
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the access platform is in position at the related emergency exit door.

 (2)
 Make sure that the related emergency exit door is open. (Ref. TASK 52-22-00-010-001)

 (3)
 Make sure that the ground service network is energized
 (Ref. TASK 24-42-00-861-001)


 (4)
 Clean the component interface and/or the adjacent area.

 (5)
 Do an inspection of the component interface and/or the adjacent area.

 (6)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 


 Subtask 25-23-47-865-084
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05
 4. Procedure
_________ Subtask 25-23-47-420-117
 A. Installation of the Door Lining 843HZ (844HZ) (834HZ) (4)
 (Ref. Fig. 404/TASK 25-23-47-991-015)

 WARNING : MAKE SURE THE PERCUSSION LEVER OF THE DOOR DAMPER CYLINDER IS
_______ IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Put the door lining (4) in position, engage the attach brackets to the yo-yo rolls and attach it with the screws (14).


 (3) Install the screws (10) and the washers (11). Subtask 25-23-47-420-118
 B. Installation of the Door Lining 843GZ (844GZ) (834GZ) (3)
 (Ref. Fig. 404/TASK 25-23-47-991-015)

 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Put the door lining (3) in position and attach it with the screws (12), (16), (20), the washers (15), (19) , the nut (13) and the bracket (24).

 (3)
 Install the screws, the washers, the nuts and the bracket as identified during the removal procedure.

 


 Subtask 25-23-47-420-119
 C. Installation of the Door Lining 843CZ (844CZ) (834CZ) (2)
 (Ref. Fig. 404/TASK 25-23-47-991-015)

 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the slide arm indicator light (Ref. TASK 52-73-21-400-003)

 (3)
 Install the cabin pressure light panel (Ref. TASK 52-73-22-400-003)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(51)