 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1)
 Make sure that the work area is clean of tools and other items.

 (2)
 Put the door frame lining (39) in position on the door frame and engage the attach brackets to the yo-yo rolls.

 (3)
 Install the handle section LWR (41) with the screws (44) and the washers (45).

 (4)
 Install the cover (43) to the handle section LWR (41). NOTE : Make sure that the lugs (42) of the cover (43) engage

____
 correctly and you hear a click.


 (5)
 If necessary install the recessed panel (49).
 NOTE : Make sure that the burrtape touches correctly.

 

 

____ Subtask 25-23-47-420-067
 C. Installation of the Door Frame Lining(s) 232GX (35) and/or 232KX(38) (Ref. Fig. 403/TASK 25-23-47-991-009)
 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (2)
 Put the door frame lining(s) (35) and/or (38) in position on the door frame structure, engage the attach brackets to the yo-yo rolls.

 (3)
 Install the door frame lining(s) (35) and/or (38) with the screws


 (36) and the washers (37). Subtask 25-23-47-420-068
 D. Installation of the Door Frame Lining (28)
 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (2)
 Remove the blanking plug from the disconnected line end.

 (3)
 Install the outlet (34) with the screws (32) and the washers (33) to the door frame lining (28).

 (4)
 Install the door frame lining (28) with the screws (30) and the washers (31) to the door frame structure.

 (5)
 Install the hose with the clamp (29).

 


 Subtask 25-23-47-420-069
 E. Installation of the Door Frame Lining 232YX (27)
 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1) Install the door frame lining (27) with the screws (25) and the washers (26).
 Subtask 25-23-47-420-070
 F. Installation of the Door Frame Lining 232NX (22)
 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1)
 Install the door frame lining (22) with the screws (23), (25) and the washers (24), (26).

 (2)
 Install the screws and the washers as identified during the removal procedure.


 (3) Close the access panel (9). Subtask 25-23-47-420-071
 G. Installation of the Door Frame Lining (8)
 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (a) Install the inflation reservoir refer to (Ref. TASK 25-62-49-400-001).

 (2)
 Make sure that the access panel (9) is open.

 (3)
 Put the door frame lining (8) in position on the door frame structure and install it with the screws (10), (12) and the washers (11), (13) and the shims (14).

 (4)
 Install the screws and the washers as identified during the removal procedure.

 (5)
 Close the access panel (9).

 


 Subtask 25-23-47-420-072
 H. Installation of Escape Slide Lever Cover (1)
 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1)
 Make sure that the work area is clean and clear of tools and other items.

 (2)
 Install the escape slide lever cover (1) with the screws (2), (3) and the washers (4) and the escape slide lever cover (1).


 Subtask 25-23-47-420-078
 J. Installation of the Hook (5)
 (Ref. Fig. 403/TASK 25-23-47-991-009)

 (1) Install the screws (6) the washers (7) and the hook (5) to the door frame.
 Subtask 25-23-47-210-069
 K. Visual Inspection
 (1)
 Make sure that all placards of the retained/new components are in the correct condition and in good condition.

 (2)
 If necessary install new placards, refer to (Ref. TASK 11-00-00-400-002) (Ref. AMM 11-32-25 P.Block 001)


 5. Close-up
________ Subtask 25-23-47-865-064
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1WL, 2WL, 3WL, 153RH
 Subtask 25-23-47-410-070
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the related emergency exit door (Ref. TASK 52-22-00-410-001).

 (3)
 Install the cabin emergency lights 34WL (Ref. TASK 33-51-11-400-001).

 (4)
 Install the cabin-wall mounted emergency-exit-marker 90WL4 (Ref. TASK
 