• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 308LG 
R  **ON A/C 216-216, 
R  Post SB 23-1208 For A/C 216-216, 
R  Subtask 25-23-42-865-059 
R  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
R  breaker(s): 
R  15RA 
R  Subtask 25-23-42-820-050 
R  C. Do the adjustment of the cameras (Ref. TASK 23-72-51-820-001). 
R  **ON A/C ALL
 Subtask 25-23-42-710-050 
R  D. Do the operational test on the ceiling lights in the forward utility area
 (Ref. TASK 33-21-00-710-001). 
R  **ON A/C 216-216, 
R  Post SB 23-1208 For A/C 216-216, 
R  Subtask 25-23-42-710-050-A 
R  D. Do the operational test on the ceiling lights in the forward utility area 
R  (Ref. TASK 33-21-00-710-001). 
R  (1) Do the operational test of the anti-hijack camera-monitoring-system 
R  (Ref. TASK 23-72-00-710-001).

 EFF : ALL

25-23-42Page 420
Feb 01/04


R **ON A/C ALL
 Subtask 25-23-42-862-050 R E. De-energize the ground service network (Ref. TASK 24-42-00-862-001)
 EFF : ALL


25-23-42Page 421


 TASK 25-23-42-400-002
 Installation of the Ceiling Panels - Aft Utility Area

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
98A25207503000 1 PULLEY ASSEMBLY - SEALING CORD
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power
 24-42-00-862-001  De-energize the Ground Service Network Supplied from the External Power
R  25-26-41-000-003 Removal of the Aft Curtain Rail 33-21-00-710-001 Operational Test of the General Illumination 25-23-42-991-005 Fig. 402
 3. Job Set-up
__________
 Subtask 25-23-42-860-052

 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001)

 (2)
 Make sure the aft curtain and curtain rail are removed (Ref. TASK 25-26-41-000-003), if required.

 (3)
 Clean the component interface and/or the adjacent area.

 (4)
 Do an inspection of the component interface and/or the adjacent area.


 EFF : ALL

25-23-42Page 422


 (5) Make sure that the parts retained from the removed component are clean and in the correct condition.
 Subtask 25-23-42-865-054
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LIGHT-CABIN ENTRY 308LG J04
 4. Procedure
_________
 (Ref. Fig. 402/TASK 25-23-42-991-005) Subtask 25-23-42-420-062
 A. Installation of the trim panel (1)
 (1)
 Put and hold the trim panel (1) in position on the mounting structure

 (8) .

 (2)
 Through the openings for the ceiling panels (2) and (5), do the steps

 (a)
 to (d).

 (a)
 Install the bolts (17) and washers (18).

 (b)
 Remove the blanking caps from the electrical connectors.

 (c)
 Make sure that the electrical connectors are clean and in the correct condition.

 


 (d) Connect the electrical connector (6) 7243VC. Subtask 25-23-42-420-054
 B. Installation of the ceiling panel(s) (3) and/or (4)
 (1)
 Hold the ceiling panel(s) (3) and/or (4) in position next to the hinges.

 (2)
 Install the screws (12).

 (3)
 Attach the second safety strap (14) to the bracket (16) on the ceiling panel(s) (3) and/or (4).


 EFF : ALL

25-23-42Page 423


 (4)
 Remove the blanking caps from the electrical connectors.

 (5)
 Make sure that the electrical connectors are clean and in the correct condition.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(14)