A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
EFF : ALL
25-24-00Page 501
4. Procedure
_________
Subtask 25-24-00-820-051
A. Adjust the Doors
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-228,
(Ref. Fig. 501/TASK 25-24-00-991-001) R **ON A/C 106-149, 229-299, 301-399, 401-499,
(Ref. Fig. 501A/TASK 25-24-00-991-001-A)
**ON A/C ALL
(1)
Align the door with the adjacent doors.
(a)
Open the applicable door.
(b)
Loosen the screws (4).
(c)
Move the door to align it with the adjacent doors.
(d)
Tighten the screws (4).
(e)
Close the door.
(f)
Make sure that the door is aligned with the adjacent doors.
(2)
Adjust the gap between the doors.
(a)
Open the door.
(b)
Loosen the screws (3).
(c)
Move the door forward or aft, as necessary.
(d)
Tighten the screws (3).
(e)
Close the door.
(f)
Make sure that the distance between the doors is 10 +2 -2 mm (0.3937 +0.0787 -0.0787 in.).
EFF : ALL
25-24-00Page 502
Adjustment of the Overhead Stowage-Compartment Doors Figure 501/TASK 25-24-00-991-001
R EFF : 001-049, 051-099, 101-105, 151-199, 201-228, 25-24-00 Page 503 May 01/05
CES
Adjustment of the Overhead Stowage-Compartment Doors Figure 501A/TASK 25-24-00-991-001-A
R EFF : 106-149, 229-299, 301-399, 401-499, 25-24-00 Page 504 Aug 01/05
CES
(3) Adjust the door keeper.
(a) Open the door.
(b) Loosen the screws (5).
(c) Move the door keeper (6), as necessary.
(d) Tighten the screws (5).
(e) Close the door.
R R R R (f) Make sure that the door locks correctly. Both hooks fully engaged. If the hooks are not fully engaged, move the keeper to inboard (A/C aisle) position (steps (a), (b), (c)) and proceed with step (d).
(4) Adjust the door opening angle.
(a) Open the door.
(b) Loosen the bolts (1).
(c) Move the support (2) until the bottom lip of the door is 1962 +10 -0 mm (77.24 +0.40 -0.00 in.) above the floor.
NOTE : The bottom lip of a door at FR20/21 and FR65/66 must be____ 1933 +10 -0 mm (76.10 +0.40 -0.00 in.) above the floor.
(d) Tighten the bolts (1).
(e) Make sure that the door locks correctly.
5. Close-up________
Subtask 25-24-00-410-050
A. Close Access
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Close the overhead stowage-compartment door.
EFF : ALL
25-24-00Page 505
Subtask 25-24-00-862-050
B. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
EFF : ALL
25-24-00Page 506
R TASK 25-24-00-710-002
R Adjustment of the Overhead Stowage-Compartment (OHSC)
R 1. Reason for the Job__________________
R Self Explanatory
R 2. Job Set-up Information______________________
R A. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 24-42-00-861-001 Energize the Ground Service Network from the External
R Power
R 24-42-00-862-001 De-energize the Ground Service Network Supplied from
R the External Power
R 25-23-48-400-001 Installation of the Cove Light Panels
R 25-24-41-400-001 Installation of the Overhead Stowage Compartments
R 25-24-00-991-002 Fig. 502
R 3. Job Set-up__________
R Subtask 25-24-00-861-051