• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE : Make sure that you can move the door window-shade
____
 correctly.

 (3) Install the handgrip
 (a)
 Put the lining (20) in position.

 (b)
 Install the spacer (19), the handgrip (24), the washers (18), and the screws (17) and (23).

 (c)
 TORQUE the screws to between 0.8 and 0.9 m.daN (70.79 and 79.64 lbf.in)

 (d)
 Install the grip cover (22) to the handgrip (24). NOTE : Make sure that the lugs (28) of the grip cover (22) engage


____
 correctly up until you hear a click.

 (4) Install the lining 832CZ (842CZ) (1)
 (a)
 Engage the lining (1) to the yo-yo rolls and install the washers

 (3) and the screws (4).

 (b)
 Put the handle plate (14) of the emergency control handle (16) in position and install the screw (15), the washer (13) and the nut (12).


 NOTE : Make sure that the handle plate is installed so that the
____ emergency control handle will retract into the recess in the door panel.
 (5) Install the lining 832EZ (842EZ) (2)
 (a) Engage the lining (2) to the yo-yo rolls and install the washers
 (3) and the screws (4).
 EFF : ALL

25-23-46Page 421
Feb 01/01
R
 CES


 (6)
 Install the lining 832GZ (842GZ) (9)

 (a)
 Put the lining (9) in position and install the pin (5).

 (b)
 Safety the pin (5) with the new:

 -
cotter pin (6)

 -
cotter pin (6)

 

 (c)
 Connect the rod (7) to the lining (9).

 

 (7)
 Install the lining 832FZ (842FZ) (8)

 (a)
 Put the lining (8) in position.

 (b)
 Turn the bracket into position and install the washers (3) and the screws (4).

 (c)
 Tighten the screws (4).

 (d)
 Put the grip (27) in positionand install the washers (25) and the screws (26).

 


 5. Close-up
________ Subtask 25-23-46-410-053
 A. Close Access
 (1) Install the cabin escape facilities: FOR 832AZ, 842AZ install the escape slide/raft (Ref. TASK 25-62-44-400-001)
 Subtask 25-23-46-210-055
 B. Preparation for Installation
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Make sure that all placards of the retained/new components are in the correct position and in good condition.

 (4)
 If necessary install new placards, refer to (Ref. TASK 11-00-00-400-002) and (Ref. AMM 11-32-25 P.Block 001)


 EFF : ALL

25-23-46Page 422
Feb 01/01
R
 CES  Subtask 25-23-46-865-055


 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 15WN, 13WN, 48WV.
 Subtask 25-23-46-862-051
 D. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)

 EFF : ALL

25-23-46Page 423


 LINING - EMERGENCY EXIT - REMOVAL/INSTALLATION
______________________________________________
 TASK 25-23-47-000-001
 Removal of the Lining from the Emergency Exit Hatches
 NOTE : The removal and installation of the linings is the same for all the
____ emergency exit hatches.
 1. Reason for the Job__________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 52-21-11-000-001 Removal of the Emergency Exit Hatch 25-23-47-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 25-23-47-861-070
 A. Energize the ground service network (Ref. TASK 24-42-00-861-001) Subtask 25-23-47-010-051
 B. Get Access
 (1) Remove the emergency exit hatch (1) (Ref. TASK 52-21-11-000-001)
 4. Procedure
_________ Subtask 25-23-47-020-050
 A. Removal of the Lining (2)
 (Ref. Fig. 401/TASK 25-23-47-991-001)

 (1) Remove the screws (3), (5) and the washers (4), (6) that attach the lining (2) to the emergency exit hatch (1) and remove it.
R  EFF : 001-049, 051-099, 101-149, 151-199, 25-23-47Page 401 201-299, 401-499, Config-1 Aug 01/05
 CES
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(35)