• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 EFF : ALL

25-23-44Page 404


 4. Procedure
_________ (Ref. Fig. 401/TASK 25-23-44-991-001) Subtask 25-23-44-420-050
 A. Installation of the Panel (2)
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Engage the fasteners (3) in the attachment fittings (4) and install the panel (2).

 (3)
 Install the quick release pins (1).


 5. Close-up
________ Subtask 25-23-44-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 If necessary install the passenger seats removed for access (Ref. TASK 25-21-41-400-001).


 Subtask 25-23-44-862-052
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)

 EFF : ALL

25-23-44Page 405


 PANELS - LOWER SIDEWALL - INSPECTION/CHECK
__________________________________________ TASK 25-23-44-210-001 Detailed Visual Inspection of the Lower Sidewall Panel and of the Area Behind
 the Lower Sidewall Panel for Foreign Material Accumulation.
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 252331-01


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 
24-42-00-862-001 
R R R  25-23-44-000-001 25-23-44-400-001 25-23-44-991-003 
3. Job Set-up__________
 Subtask 25-23-44-861-052

Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External Power Removal of the Lower Sidewall-Panels (Dado Panels) Installation of the Lower Sidewall-Panels (Dado Panels)Fig. 601
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 25-23-44-010-053
 B. Get Access
 (1) Remove the lower sidewall panel(s) as necessary (Ref. TASK 25-23-44-000-001).
 NOTE : Remove one lower sidewall panel in the FWD, MID and AFT
____ passenger cabin. Alternate sidewall panel is recommended at the next inspection. Interval may be adjusted according to operator experience.
 EFF : ALL

25-23-44Page 601


 4. Procedure
_________ Subtask 25-23-44-210-052
 A. Visual Inspection
 (1) Do a detailed visual inspection of the lower sidewall panel and of the area behind the lower sidewall panel for foreign material accumulation. (Ref. Fig. 601/TASK 25-23-44-991-003)
 5. Close-up
________ Subtask 25-23-44-410-053
 A. Install the lower sidewall panels (Ref. TASK 25-23-44-400-001) Subtask 25-23-44-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 EFF : ALL

25-23-44Page 602


 Lower Sidewall Panels
 Figure 601/TASK 25-23-44-991-003
 EFF :  ALL  25-23-44 Page 603 
Feb 01/98
 CES 

 

 LINING - DOOR FRAME - REMOVAL/INSTALLATION
__________________________________________
 TASK 25-23-45-000-005
 Removal of the Door Frame Linings at the Left FWD Passenger/Crew Door
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
R No specific 1 CAP - BLANKING, PLASTIC No specific 1 PLUG - BLANKING, PLASTIC No specific 1 SCREWDRIVER - SMALL
R No specific 1 WARNING NOTICE
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power
 33-51-11-000-001 Removal of the Cabin Emergency Lights
 33-51-13-000-001 Removal of the Cabin Wall-Mounted

 Emergency-Exit-Markers
 33-51-16-000-001 Removal of the Emergency Exit Sign
 52-10-00-010-001 Opening of the Passenger/Crew Door
 25-23-45-991-006-A Fig. 401

 3. Job Set-up
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(19)