 Linings - FWD Passenger/Crew Door Frame-Linings Figure 011
R  EFF : CES  ALL  25-23-00 Page 20 May 01/04 

 

 Linings - AFT Passenger/Crew Door Frame-Linings
 Figure 012
 EFF :  ALL  25-23-00 Page 21 
May 01/04
 CES 

 

 Lining - Emergency-Exit-Hatch Lining Figure 013 
R  EFF : 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  25-23-00 Page 22 Aug 01/05
 CES 

 

R  **ON A/C 301-399, 
R  C. Door and Door Frame Linings 
R  The door and door frame linings are made of synthetic material. Screws 
R  attach the panels to brackets on the frames in the door areas. Seals are 
R  bonded to the edges of each lining. Covers, in the passenger/crew service 
R  doors and frame linings, give a cover e.g. for the door locking hooks. 
R  (1) Passenger/Crew Door Linings and Frame Linings 
R  (Ref. Fig. 009, 010, 011, 012) 
R  (2) Emergency Exit Door Linings and Frame Linings 
R  (Ref. Fig. 014, 015, 016)

 CES


R  Linings - FWD/left Emergency-Exit-Door Frame-Linings 
R  Figure 014
 EFF :  301-399,  25-23-00 Page 24 
May 01/04
 CES 

 

R R  Linings - FWD/right and AFT/left and right Emergency-Exit-Door Frame-Linings Figure 015
 EFF :  301-399,  25-23-00 Page 25 May 01/04
 CES 

 

R R  Linings - Emergency-Exit-Door Linings Figure 016 (SHEET 1)
 EFF :  301-399,  25-23-00 Page 26 May 01/04
 CES 

 

R R  Linings - Emergency-Exit-Door Linings Figure 016 (SHEET 2)
 EFF :  301-399,  25-23-00 Page 27 May 01/04
 CES 

 

 PANELS - CEILING - REMOVAL/INSTALLATION
_______________________________________
 TASK 25-23-41-000-001
 Removal of the Ceiling Panels
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power AMM 06-41-53 P.B. 001
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-228,
 25-23-41-991-001 Fig. 401 R **ON A/C 106-149, 229-299, 301-399, 401-499,
 25-23-41-991-001-A Fig. 401A
 EFF : ALL

25-23-41Page 401

 **ON A/C ALL


 3. Job Set-up
__________
 Subtask 25-23-41-861-050

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001)

 Subtask 25-23-41-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU CABIN LIGHT POWER-CEILING AFT 304LG H07 2000VU CABIN LIGHT POWER-CEILING FWD 305LG H05 2000VU CABIN LIGHT POWER-CEILING FWD 306LG H06 2000VU CABIN LIGHT POWER-CEILING AFT 307LG H08
 4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-228,
 Subtask 25-23-41-020-050
 A. Removal of the Ceiling Panel (4)
 (Ref. Fig. 401/TASK 25-23-41-991-001)

 NOTE : The panel identification/location is found in (Ref. AMM 06-41-53
____ P.B. 001).
 (1)
 Open the left and right overhead compartment doors below the ceiling panel.

 (2)
 Open the access doors (2) in the left and right overhead stowage compartments.

 (3)
 Disconnect the electrical connectors (1) left and right at the access doors (2).

 (4)
 Put blanking caps on the disconnected electrical connectors.

 (5)
 Close the overhead stowage compartment doors.


 EFF : ALL

25-23-41Page 402


 Ceiling Panels Figure 401/TASK 25-23-41-991-001 
 