• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:24来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 Subtask 25-30-00-862-054
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 EFF : ALL
25-30-00Page 310


 BUFFET AND GALLEY - INSPECTION/CHECK
____________________________________
 TASK 25-30-00-210-001
 Detailed Visual Inspection of the Galley Attachment Points
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 253000-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific mirror R
R B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 25-23-41-000-001 Removal of the Ceiling Panels 25-23-41-400-001 Installation of the Ceiling Panels 25-23-45-000-002 Removal of the Door Frame Linings at the Right FWD
 Passenger/Crew Door 25-23-45-000-003 Removal of the Door Frame Linings at the Left AFT Passenger/Crew Door 25-23-45-000-004 Removal of the Door Frame Linings at the Right AFT Passenger/Crew Door 25-23-45-400-005 Installation of the Door Frame Linings at the Right AFT Passenger/Crew Door 25-23-45-400-007 Installation of the Door Frame Linings at the Right
 FWD Passenger/Crew Door
 25-23-45-400-008 Installation of the Door Frame Linings at the Left
 AFT Passenger/Crew Door

 25-30-00-991-001 Fig. 601
 EFF : ALL
25-30-00Page 601


 3. Job Set-up
__________ Subtask 25-30-00-861-051
 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002)

 Subtask 25-30-00-010-051-A
 B. Get Access
 (1)
 Remove the galley trolleys.

 (2)
 Remove the ceiling panels and the door frame linings in the area of the forward galley (Ref. TASK 25-23-41-000-001) and (Ref. TASK 25-23-45-000-002).

 (3)
 Remove the ceiling panels and the door frame linings in the area of the aft galley (Ref. TASK 25-23-41-000-001), (Ref. TASK 25-23-45-000-004) and (Ref. TASK 25-23-45-000-003).

 (4)
 Get access to the galley attachment points.
 (Ref. Fig. 601/TASK 25-30-00-991-001)


 (a)
 Remove the screws (2) and the pelmet (1).

 (b)
 Remove the screws (3) and the access plate (4).

 (c)
 Remove the screws (9) and the pelmet (10).

 (d)
 Remove the screws (11) and the access plate (12).

 (e)
 Remove the screws (6) and the covers (5).

 (f)
 Remove the screws (7) and the covers (8).

 (g)
 Remove the screws (21) and the pelmet (20).

 (h)
 Remove the screws (23) and the access plates (22).

 (i)
 Remove the screws (25) and the covers (24).

 (j)
 Remove the screws (26) and the covers (27).

 


 EFF : ALL
25-30-00Page 602
May 01/05
R
 CES


R R  Attachment Points of the FWD Galley Figure 601/TASK 25-30-00-991-001
 EFF :  ALL  25-30-00 Page 603 May 01/03
 CES 

 

 4. Procedure
_________
 Subtask 25-30-00-210-050

 A. Examine the Attachment Points
 (1)
 Examine the upper attachment points. Use a mirror if necessary.

 (a)
 Make sure that the rods and the attach fittings are in the correct condition.

 (b)
 Make sure that the supports, the bolts and the nuts are in the correct condition.

 (c)
 Make sure that the quick-release pins are in the correct condition.

 (d)
 Make sure that the bolts, the nuts, the supports, the rods and the attach fittings are correctly installed.

 

 (2)
 Examine the lower attachment points.

 (a)
 Make sure that the supports, the bolts and the nuts are in the correct condition.

 (b)
 Make sure that the mounting points are in the correct condition.

 (c)
 Make sure that the supports, the bolts and the nuts are correctly installed.

 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM EQUIPMENT/FURNISHINGS 设备2(129)