• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:48来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 611 Leading Edge to Front Spar, Right


 C.
Prepare for Test


 S 865-080
 (1)  Close the following circuit breakers:
 (a)  P6 Main Power Distribution Panel 1) 6C5 ALTN PWR LOOP A APU FIRE/BLD DUCT OVHT 2) 6H14 APU FIRE/BLD DUCT OVHT LOOP A 3) 6H15 APU FIRE/BLD DUCT OVHT LOOP B
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-18-00
 ALL  ú ú 10 Page 514 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 865-024
 (2)  Provide electrical power (AMM 24-22-00/201).
 S 015-073
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE LE AND TE
_______ FLAPS AND FLAP DRIVE MECHANISMS BEFORE YOU MOVE THE FLAP CONTROL LEVER. WITH HYDRAULIC POWER REMOVED, THE FLAPS WILL MOVE AUTOMATICALLY BY ELECTRICAL POWER WHEN YOU MOVE THE FLAP CONTROL LEVER.
 (3)  For access to the wing leading edge thermal switches, extend the wing leading edge flaps (AMM 27-81-00/201).
 S 495-012
 WARNING: REFER TO AMM 27-81-00/201 FOR LOCK INSTALLATION PROCEDURE.
_______ FLAPS WILL REACT IN 7 SECONDS. INSTALL LOCKS TO PREVENT INJURY FROM INADVERTENT OPERATION OF FLAPS.
 (4)  For wing leading edge thermal switches, install safety locks on all extended leading edge flaps. For access to the thermal switches, refer to AMM 26-18-02/401.
 D. Sensor Test
 NOTE: Do this test, one at a time, for every sensor listed in Fig. 502.
____ S 015-022
 (1)
Open the access panels for sensor to be tested (AMM 26-18-02/401).

 S 485-013

 (2)  
Install a jumper between pins 1 and 2 of the sensor listed in the Fig. 502.

 (3)
Make sure the applicable EICAS message listed on Fig. 502 shows.

 (4)  
Remove the jumper from the sensor.

 (5)  
Make sure the applicable EICAS message does not show.

 (6)  
Do the test again for the next sensor listed on Fig. 502.


 S 735-014
 S 085-022
 S 715-023
 S 845-024
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-18-00
 ALL  ú ú 13 Page 515 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 E. Do the Wing Leading Edge Duct Dual Loop Sensor Test
 S 485-023
 (1)  
Install a jumper between pins 1 and 2 of the sensor S909.

 S 715-024

 (2)  
Make sure the EICAS status message "DUCT LEAK L LP B" shows on the screen.

 S 485-025

 (3)  
Install a jumper between pins 1 and 2 of the sensor S910.

 S 715-015

 (4)  
Make sure the EICAS status message "DUCT LEAK L LP A" shows on the screen.

 S 715-031

 (5)  
Make sure the EICAS caution message "BLD DUCT LEAK L" shows on the screen.

 S 085-016

 (6)  
Remove both jumpers.

 S 715-017

 (7)  
Make sure the EICAS messages listed below are not shown on the screen.

 (a)  
BLD DUCT LEAK L

 (b)  
DUCT LEAK L LP A

 (c)  
DUCT LEAK L LP B

 

 (8)  
Install a jumper between pins 1 and 2 of the sensor S890.

 S 715-019

 (9)  
Make sure the EICAS status message "DUCT LEAK R LP B" shows on the screen.


 S 485-018
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-18-00
 ALL  ú ú 17 Page 516 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 485-020
 (10)
 Install a jumper between pins 1 and 2 of the sensor S891.

 S 715-021

 (11)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 防火 FIRE PROTECTION 2(30)