• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:48来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

S2244  DUCT LEAK C LP B 
S2225  DUCT LEAK C LP A 
S2224  DUCT LEAK C LP B 
S2227  DUCT LEAK C LP A 
S2226  DUCT LEAK C LP B 
S2229  DUCT LEAK C LP A 
S2228  DUCT LEAK C LP B 
S2231  DUCT LEAK C LP A 
S2230  DUCT LEAK C LP B 

Thermal Switch/EICAS Message Correlation
Figure 502 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-18-00
 ALL  ú ú 12 Page 506 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 2) 6H2 FIRE EXTINGUISHER ENG 1&3 A 3) 6H3 FIRE EXTINGUISHER ENG 2&4 B 4) 6H4 FIRE EXINGUISHER ENG 2&4 A 5) 6H5 FIRE EXTINGUISHER APU 6) 6C6 FIRE SW UNLOCK
 D. Operational Test Using FIRE/OVHT Test Switch
 S 865-034
 CAUTION: MAKE SURE THE TWO GROUND TEST SWITCHES ARE SET TO NORM AFTER A
_______
 GROUND TEST IS COMPLETE.

 (1)  Press and hold the FIRE/OVHT test switch on M7317 (P5).
 NOTE: Do not release the test switch during the test until either
____ the EICAS message "FIRE TEST FAIL" or "TEST PASSED" is displayed. If the test is released before the EICAS message "TEST PASSED" or "FIRE TEST FAIL" is displayed, the test has not been completed.
 S 865-005
 (2)  Make sure these indications occurr:
 (a)  The EICAS shows the TEST IN PROGRESS message while the test is in progress. Make sure the EICAS shows the TEST PASSED message when the test is complete.
 NOTE: The EICAS can show the FIRE TEST FAIL message if
____ circuit breakers are open or a fault is on a related fire/overheat system.
 (b)  Make sure the EICAS does not show these messages: 1) BLD DUCT LEAK C 2) BLD DUCT LEAK L 3) BLD DUCT LEAK R
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-18-00
 ALL  ú ú 16 Page 507 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (c) Aural warning operates.
 S 715-005

 (3)  
Release the switch and make sure the above indications go off.

 E.  
Operational Test using CMC S 865-079


 CAUTION:  AFTER PERFORMING A GROUND TEST, MAKE SURE THAT BOTH GROUND TEST
_______ SWITCHES ARE SET TO "NORM".
 (1)  Set one of these switches to "ENABLE" position:
 (a)  
S2089 Ground Test Enable Switch (P461)

 (b)  
S2090 Remote Test Enable Switch (RCDU).


 S 865-067
 (2)  
Set the CDU to the CMC main menu.

 S 865-008

 (3)  
Select "<GROUND TESTS," press the line select key next to it.

 S 865-009

 (4)  
Select "<26 FIRE PROTECTION" from the menu.

 S 865-082

 (5)  
Press the LINE SELECT key for FIRE SYSTEM TEST.

 S 745-011

 (6)  
The "IN PROGRESS" indication will be generated for the duration of the test.

 S 745-012

 (7)  
When the test is finished, the screen displays "PASS" or "FAIL>".

 S 745-013

 (8)  
If the indication is "PASS", the test is finished.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-18-00
 ALL  ú ú 20 Page 508 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 745-076
 (9)  If the indication is FAIL>, press the line select key next to FAIL> and verify that any wing leading edge CMC maintenance fault messages do not appear. Perform the corrective action(s) for the CMC message(s) listed. Use the NEXT PAGE or PREV PAGE button to look through the messages.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 防火 FIRE PROTECTION 2(26)