EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-00
ALL ú ú 05 Page 508 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
11) Look at the VALVE position indicator. 12) Slowly increase the barometric correction at a rate not more than 0.3 inch Hg (10 mb)/minute.
NOTE: The function of this step is to change the
____ barometric pressure the minimum quantity necessary to close the valve. When the step is completed, a small change to decrease the correction will start to open the outflow valve.
13) When the outflow valve starts to close, do not increase the
barometric correction unless the valve is not fully closed. 14) Increase the LAND ALT adjustment to 5100 feet. 15) Make sure the outflow valve stays closed. 16) Increase the LAND ALT adjustment to 5700 feet. 17) Make sure the outflow valve opens. 18) Close the LANDING GEAR AIR/GND RELAY & LTS circuit breaker. 19) Put the mode selector switch to AC MAN. 20) Set the toggle switch to OPEN. 21) Make sure the outflow valve is open.
S 865-010
(5) Remove the electrical power if it is not necessary
(AMM 24-22-00/201).
TASK 21-31-00-725-011
3. Functional Test of the Pressure Controller (Fig. 501)
__________________________________________
A. General
(1) The tests in this procedure isolate the problems to these components:
(a)
Pressure controller
(b)
Pressure control panel
(c)
Aft outflow valve
(d)
Barometric correction potentiometers
(e)
Landing gear module
(f)
Air data computer
(g)
Electrical wires in the system.
(h)
Use the specified meter when you measure ac voltages at test pin M. You can get voltages that are very much lower than the specified voltages if you use the incorrect meter.
B. Special Tools and Equipment
(1) Simpson meter 260, model 4M.
NOTE: Do not use this meter for measurement of millivolts.
____
(2) Portable vacuum tube voltmeter or digital voltmeter (accuracy |0.020 volts dc).
NOTE: Use this meter to measure millivolts.
____
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-00
ALL ú ú 02 Page 509 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C.
D.
E.
F.
A
737-300/400/500MAINTENANCE MANUAL
(3) Breakout box (P/N F80206-1).
NOTE: The use of the breakout box is optional.
____
References
(1)
AMM 24-22-00/201, Electrical PowerAccess
(1)
Location Zone 101 Left Control Cabin 102 Right Control Cabin 205 E/E Equipment Compartment
Prepare for the test
S 865-012
(1)
Supply electrical power (AMM 24-22-00/201).
S 865-013
(2)
Make sure that these circuit breakers on the P6 panel are closed.
(a)
AUTOMATIC AC and DC
(b)
STBY AC and DC
(c)
MAN AC and DCProcedure
S 725-014
(1)
Do this test of the potentiometer wiper (test pin A or test jack 1) for the standby rate:
(a)
Set the mode selector switch to STBY.
(b)
Set the CABIN RATE control on the pressurization control panel at the triangular mark.
(c)
Set the FLT/GRD switch to GRD.
(d)
Connect a voltmeter between test pin A and test pin N (or test jack 1 and test jack 13) on the pressure controller. 1) AIRPLANES WITH PRESSURE CONTROLLER CPC22;
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 1(89)