• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:32来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 VENT MUFFLER - MAINTENANCE PRACTICES
____________________________________
 1.  General
_______
 A.  This procedure has two tasks. The first task gives instructions to clean the vent muffler. The second task gives instructions to repair the vent muffler.
 B.  The air velocity through the vent muffler can increase if the vent muffler shell has contamination or cracks. This can cause noise levels to increase.
 TASK 21-23-17-102-001
 2.  Vent Muffler Cleaning
_____________________
 A.  Access
 (1)  Location Zones
 104 Forward Galley
 109 Aft Galley

 B.  Procedure
 S 012-002
 (1)
Remove the ceiling panel to get access to the vent muffler.

 S 022-003

 (2)  
Remove the vent muffler.

 (3)  
Push a wooden cylinder plug through the vent muffler.


 S 142-004
 NOTE: The plug diameter must be smaller than the orifice diameters
____
 of the muffler.

 S 142-005
 (4)  Push the plug through the ducts which connect to the vent muffler if it is necessary.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-23-17
 ALL  ú ú 02 Page 201 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 422-006
 (5)
Install the vent muffler.

 S 412-007

 (6)
Install the ceiling panel.


 TASK 21-23-17-302-008
 3. Vent Muffler Repairs
____________________
 A. Consumable Materials
 (1)
B00192 Solvent - BMS 3-2, Type I (AMM 20-30-31/201)

 (2)
G02129 Tape, Vinyl - Permacel P29 (AMM 20-30-51/201)


 B. Access
 (1)  Location Zones
 104 Forward Galley
 109 Aft Galley

 C. Procedure
 S 012-009
 (1)
Remove the ceiling panel to get access to the vent muffler.

 S 022-010

 (2)
Remove the vent muffler.

 S 112-011

 (3)
Use the solvent, BMS 3-2, to clean the crack in the vent muffler.

 S 362-012

 (4)
Apply the vinyl tape to the crack.


 NOTE: The tape must make a 2 inch overlap on all sides of the
____
 crack.

 S 422-013
 (5)
Install the vent muffler.

 (6)
Install the ceiling panel.


 S 412-014
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-23-17
 ALL  ú ú 01 Page 202 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 AIR CONDITIONING SYSTEM DUCTS - REPAIRS
_______________________________________
 1.  General_______
 A.  This procedure gives instructions for the repair of the following types of air conditioning ducts:
 (1)  
Fiberglass or Kevlar Duct (Fig. 201)

 (a)  
Taped Joint Repair

 (b)  
External Patch Repair

 (c)  
Structural Repair

 

 (2)  
Polyurethane Foam Duct (Fig. 202)

 (a)  
Taped Joint Repair

 (b)  
Duct End Repair

 (c)  
External Patch Repair

 (d)  
Structural Repair

 (e)  
Inner Lining Repair

 (f)  
Duct Section Replacement

 

 (3)  
Ducts with Polyimide Foam Insulation (Fig. 203)

 (a)  
Tape Replacement

 (b)  
Insulation Repair

 (c)  
Insulation Replacement

 

 (4)  
Ducts with Fiberglass Insulation and Flame-Resistant Covering (Fig. 204)

 (a)  
Tape Replacement

 (b)  
Insulation and Covering Repair

 (c)  
Duct Replacement

 


 TASK 21-23-25-302-001
 2.  Taped Joint Repair - Fiberglass or Kevlar Duct (Fig. 201)______________________________________________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 1(45)