• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:32来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 21-32-41
 ALL  ú ú 01 Page 402 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL


CAP STRIP INBD

B-B
NOTE:

MAKE SURE THESE STENCILS ARE ON
THE BLOWOUT PANELS:
-ON THE TOP SIDE (AFT COMPARTMENT ONLY):

"PUSH DOWN FOR EMERGENCY ACCESS TO CARGO
COMPARTMENT."

-ON THE LOWER SIDE: "CONTROLLED PRESSURE RELIEF PANEL" AND "ENGAGE EDGES BETWEEN 0.20 AND 0.25 INCHES AND TIGHTEN RESTRAINING BOLTS 20 TO 25 POUND-INCHES TORQUE"
Cargo Compartment Ceiling Blowout Panel Installation Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-32-41
 ALL  ú ú 01 Page 403 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 024-004
 (3) Remove the blowout panel from the cargo compartment ceiling.
 TASK 21-32-41-404-005
 3.  Cargo Compartment Ceiling Blowout Panel Installation____________________________________________________
 A. Access
 (1)  
Location Zones
 209 Forward Cargo Compartment
 218 Aft Cargo Compartment


 (2)  
Access Panels
 4405R Forward Cargo Door Access Panel
 4406R Forward Cargo Door Access Panel
 4505R Aft Cargo Door Access Panel
 4506R Aft Cargo Door Access Panel

 

 B. Procedure
 S 354-006
 (1)  If a serviceable blowout panel is not available, make a blowout panel:
 (a)  
Make the new panel from the same material as the defective panel.

 (b)  
If it is possible, use the defective panel as a template to make the new panel.

 (c)  
Make the serviceable panel larger than the defective panel.

 (d)  
Put the panel in the center of the opening in the ceiling.

 (e)  
Install the cap strips and tighten the restraining bolts until the cap strips touch the panel.

 (f)  
Make a mark on the panel where the edge of the cap strips touch the panel.

 (g)  
Remove the cap strips and then the panel.

 (h)  
Make one more mark that is 0.20 to 0.25 inch from the first mark and nearer to the edge.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-32-41
 ALL  ú ú 01 Page 404 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (i)  Cut off the material between the second mark and the outer edge
 of the panel.
 (j)  Put the stencil on the panel.
 NOTE:____ The data about the stencil is in Fig. 401.

 S 424-007
 (2)  
Put a serviceable blowout panel in its position against the depressor strips and loosely install the restraining bolts.

 S 824-008

 (3)  
If the panel has a mark around its outer edge, align the mark with the edge of the cap strips.


 S 824-011
 CAUTION: MAKE SURE THAT THE RESTRAINING BOLTS ARE CORRECTLY TIGHTENED.
_______ MAKE SURE THE CAP STRIPS TOUCH A MINIMUM OF 0.20 INCH AND A MAXIMUM OF 0.25 INCH OF THE OUTER SURFACE OF THE PANEL. THE BLOWOUT PANEL WILL NOT OPERATE CORRECTLY IF YOU DO NOT DO THESE STEPS.
 (4)  
Make sure the cap strips touch a minimum of 0.20 inch and a maximum of 0.25 inch of the outer surface of the panel.

 S 424-010

 (5)  
Tighten the restraining bolts to 20 to 25 pound-inches.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-32-41
 ALL  ú ú 01 Page 405 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 BULKHEAD BLOWOUT PANELS - REMOVAL/INSTALLATION
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 1(114)