S 862-005
(2)
Get access to the terminals of the AFT OUTFLOW HEATER circuit breaker.
S 762-007
(3)
Measure the electrical resistance at the terminal 2 of the AFT OUTFLOW HEATER circuit breaker.
S 762-008
(4)
Make sure the electrical resistance at terminal 2 is 25 to 45 ohms.
S 752-009
(5)
Do these steps if the electrical resistance at terminal 2 is not 25 to 45 ohms:
(a) Apply a source of cold air or a heat sink to the thermostat until the electrical resistance is 25 to 45 ohms.
NOTE: The temperature of the cold air or heat sink must be
____ approximately 32°F (0°C). The location of the thermostat is shown in Fig. 201.
S 862-010
(6)
Close the AFT OUTFLOW HEATER circuit breaker on the P6-4 panel.
(7)
Make sure the thermostat opens in less than 10 minutes.
(8)
Open the AFT OUTFLOW HEATER circuit breaker again.
(9)
Measure the electrical resistance at the terminal 2 again.
S 762-014
(10)
Make sure the electrical resistance shows there is open electrical circuit.
S 732-011
S 862-012
S 762-013
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-12
ALL ú ú 01 Page 203 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 862-015
(11) Close the AFT OUTFLOW HEATER circuit breaker on the P6-4 panel.
G. Put the Airplane Back to Its Usual Condition
S 862-016
(1) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a) P6-4 panel 1) PRESSURIZATION CONTROL (6 locations) 2) OUTFLOW VALVE HEATER
S 862-017
(2) Remove the electrical power if it is not necessary (Ref 24-22-00/201).
TASK 21-31-12-002-027
3. Outflow Valve Heated Gasket Removal (Fig. 201)___________________________________
A. References
(1) 21-31-11/401, Cabin Pressurization Outflow Valve
B. Access
(1) Location Zone
220 Aft Cargo Compartment Equipment Bay
C. Procedure
S 012-019
(1)
Remove the cabin pressurization outflow valve (Ref 21-31-11/401).
S 032-020
(2)
Cut the wires which attach the gasket to the ship's wiring.
(3)
Remove the gasket.
S 022-021
TASK 21-31-12-402-026
4. Outflow Valve Heated Gasket Installation (Fig. 201)________________________________________
A. References
(1) 21-31-11/401, Cabin Pressurization Outflow Valve
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-12
ALL ú ú 01 Page 204 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
B. Access
(1) Location Zone
220 Aft Cargo Compartment Equipment Bay
C. Procedure
S 422-022
(1) Put the gasket in its position.
NOTE: Make sure the gasket is installed with the thermostat
____ installed on the forward side of the outflow valve and towards the outboard end of the valve.
S 432-023
(2) Make the wires of the gasket and the ship's wiring into a splice.
NOTE: Keep the length of the wires the same as the initial wires.
____
S 412-024
(3)
Install the cabin pressurization outflow valve (Ref 21-31-11/401).
(4)
Do the adjustment/test procedure for the gasket.
S 732-025
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-31-12
ALL ú ú 01 Page 205 ú Jul 15/97