(d)
NOSE GEAR AIR/GND
(e)
LANDING GEAR AIR/GND RELAY & LTS
S 865-319
(3)
Put the LIGHTS switch to TEST momentarily, on the P2-1 panel, and make sure that these lights come on and then go off:
(a)
MASTER CAUTION and AIR COND annunciator lights on the P7 panel
(b)
PACK TRIP OFF lights on the P5-10 panel
(4)
Open the bay doors for the air conditioning equipment.
S 015-320
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-00
ALL ú ú 01 Page 541 ú Mar 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 865-321
(5) Operate the CONT CABIN and PASS CABIN temperature selectors, on the P5-17 panel, to put the air mix valves in the full COLD position.
NOTE: The indicator needle of each AIR MIX VALVE indicator, on
____ the P5-17 panel, must align with the inner mark at the COLD position.
S 865-322
(6)
Move the CONT CABIN and PASS CABIN temperature selectors to MANUAL OFF.
S 865-323
(7)
Make sure that the indicator needle of the visual indicator on each air mix valve, in the air conditioning bay, is at the full COLD position.
NOTE: Refer to 21-61-00/101, Temperature Control System, if the
____ indicator needles are not at the full COLD position.
S 865-324
(8) Set the positions of these switches, on the P5-10 panel, as follows:
(a)
Put the engine BLEED 1 switch to OFF.
(b)
Put the engine BLEED 2 switch to ON.
(c)
Put the APU BLEED switch to ON.
S 865-325
(9) Start the APU (AMM 49-11-00/201).
NOTE: The electrical load is to be less than 25 amperes.
____
S 865-326
(10)
Move the L PACK and R PACK switches to OFF, on the P5-10 panel.
(11)
Move the ISOLATION VALVE switch to OPEN, on the P5-10 panel.
S 865-328
(12)
Move the RECIRC FAN switch to OFF, on the P5-10 panel.
S 865-327
E. Procedure
S 865-145
(1) Set the L PACK switch to HIGH.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
21-51-00
ALL ú ú 01 Page 542 ú Mar 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
S 035-146
(2) Disconnect the solenoid A electrical connector, D392 (APU high flow
mode), from the left pack flow control and shutoff valve.
S 215-232
(3) Make sure that the flow control and shutoff valve for the left pack
moves towards the closed position.
S 215-147
(4) Make sure that the APU EGT decreases.
NOTE:____ If the APU EGT does not decrease, there is a problem with
the wiring.
S 435-148
(5)
Connect the solenoid A electrical connector, D392, to the left pack flow control and shutoff valve.
S 215-233
(6)
Make sure that the flow control and shutoff valve for the left pack moves towards the open position.
S 215-149
(7)
Make sure that the APU EGT increases.
NOTE: If the APU EGT does not increase, there is a problem with
____ the wiring.
S 865-150
(8)
Set the L PACK switch to OFF.
S 865-151
(9)
Set the R PACK switch to HIGH.
S 035-152
(10)
Disconnect the solenoid A electrical connector, D394 (APU high flow mode), from the right pack flow control and shutoff valve.
S 215-234
(11)
Make sure that the flow control and shutoff valve for the right pack moves towards the closed position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 1(151)