21-CONTENTS
BEJ Page 1 Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
CHAPTER 21 - AIR CONDITIONING
TABLE OF CONTENTS
_________________
Chapter Section Subject_______ Subject ____ Effectivity
_______ Page ___________
VALVE (COLD AIR) - CHECK 21-21-04
Removal/Installation 401 ALL
VALVE - RECIRCULATION FAN CHECK 21-21-24
Removal/Installation 401 ALL
CONTROL CABIN CONDITIONED AIR 21-22-00
DISTRIBUTION SYSTEM
Description and Operation 1 ALL General 1 Control Cabin Conditioned Air 1
Outlets
Muffler 5
DUCT, CONDITIONED AIR - CONTROL 21-22-11
CABIN
Approved Repairs 801 ALL
PASSENGER CABIN CONDITIONED AIR 21-23-00
DISTRIBUTION SYSTEM
Description and Operation 1 ALL General 1 Galley Vent System 6 Overhead Distribution Duct and 1
Diffusers
Overhead Supply Riser Ducts 1
Passenger Cabin Air Exhaust 1
DUCT - OVERHEAD DISTRIBUTION 21-23-25 Removal/Installation 401 ALL Approved Repairs 801 ALL
21-CONTENTS
BEJ Page 2 Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL CHAPTER 21 - AIR CONDITIONING TABLE OF CONTENTS
_________________
Chapter Section
Subject_______ Subject_______ Page____
Maintenance Practices 201
General 201
Duct End Repair -Polyurethane Foam Duct Duct Replacement - Duct with Fiberglass Insulation and Flame-Resistant Covering Duct Section Replacement -Polyurethane Foam Duct External Patch Repair -Fiberglass or Kevlar Duct External Patch Repair -Polyurethane Foam Duct Inner Lining Repair -Polyurethane Foam Duct Insulation Repair - Duct with Fiberglass Insulation and Flame-Resistant 217244229206219227242
Covering Insulation Repair - Duct with Polyimide Foram Insulation 235
Insulation Replacement -Duct with Polyimide Foam Insulation 237
Structural Repair -Fiberglass or Kevlar Duct Structural Repair -Polyurethane Foam Duct Tape Replacement - Duct with Fiberglass Insulation and Flame-Resistant Covering Tape Replacement - Duct with Polyimide Foam Insulation Taped Joint Repair -Fiberglass or Kevlar Duct Taped Joint Repair -Polyurethane Foam Duct MUFFLER - VENT 21-23-17 208222240234201212
Maintenance Practices 201
Cleaning Repairs 201202
EffectivityALL
ALL
21-CONTENTS
BEJ Page 3 Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL CHAPTER 21 - AIR CONDITIONING TABLE OF CONTENTS
_________________
Chapter
Section
Subject_______ Subject_______
PRESSURIZATION CONTROL______________________ 21-30-00
Description and Operation
General
Pressurization Control System
Pressurization Indication and
Warning
Pressurization Relief Valves
PRESSURIZATION CONTROL SYSTEM 21-31-00
Description and Operation
General
Cabin Pressure Outflow Valve
Forward Outflow Valve
Pressure Control Panel
Pressure Controller
Operation
Trouble Shooting
Maintenance Practices
Adjustment/Test
CONTROLLER - PRESSURE 21-31-21
Removal/Installation
GASKET, HEATED - OUTFLOW VALVE 21-31-12
Maintenance Practices
MODULE - DELTA P 21-31-22
Removal/Installation
MODULE, PRESSURE CONTROL 21-31-25
Removal/Installation
VALVE, OUTFLOW - CABIN 21-31-11
PRESSURIZATION
Removal/Installation
Approved Repairs
PRESSURIZATION RELIEF VALVES 21-32-00
Description and Operation
General
Blowout Panels
Pressure and Relief Valve
Pressure Equalization Valves
Safety Relief Valves
FILTER - SAFETY RELIEF VALVE 21-32-22
Removal/Installation
PANELS - BULKHEAD BLOWOUT 21-32-51
Removal/Installation
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 空调 AIR CONDITIONING 1(5)