• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:50来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 834-025
 (7)  
With a clamp, attach the straightedge across the thumbrests on the captain's and first officer's control wheels (Fig. 402).

 S 864-009

 (8)  
Do this task: "Hydraulic System Depressurization" (Ref 29-11-00/201).

 (9)  
Do this task: "Electrical Power Removal" (AMM 24-22-00/201).


 S 864-010
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-05
 ALL  ú ú 01 Page 402 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 014-011
 (10) Remove the 2nd and 3rd center ceiling panels.
 NOTE: Count the ceiling panels from the forward end of the main
____
 deck.

 E. Procedure
 S 024-012
 (1)  
Remove the aileron control load limiter (Fig. 401):

 (a)  
Remove cable guards (22) and the clip locks on the turnbuckles.

 (b)  
Disconnect cables ACBB (6) and ACBA (7) at the turnbuckles.

 (c)  
Disconnect the right body cables AA (4) and AB (5) at the turnbuckles.

 (d)  
Attach tags to identify the disconnected cable ends.

 (e)  
Remove the bolts (17) that attach the load limiter (3) to the lower beam (18).

 (f)  
Remove the bolts (12) that connect the lower beam (18) to the structure.

 (g)  
Remove the lower beam (18).

 (h)  
Remove cable guard and lower beam support bracket.

 (i)  
Remove straight edge and rotate first officer's control wheel to 90 degrees.

 (j)  
Align direction of fork with the slot on the upper beam.

 (k)  
Remove the bolts (17) that attach the load limiter (3) to the upper beam (24).

 (l)  
Remove the load limiter (3) from the airplane.

 (m)  
Remove the cable guards (22) and cables AA (4), AB (5), ACBB (6), and ACBA (7) from the load limiter (3).


 TASK 27-11-05-404-013
 3. Aileron Control Load Limiter Installation
_________________________________________
 A. Special Tools and Equipment
 (1)  
G12001-50 Rig Pin Kit

 (2)  
MIT65B04001-41 Control Wheel Straightedge

 B.
Consumable Materials

 (1)
C00528 Corrosion Preventive Compound - MIL-C-16173, grade 2


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-05
 ALL  ú ú 01 Page 403 ú Feb 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

SEE A
1. AILERON CONTROL
DRUM

CABLE AB
2.
 TURNBUCKLE


3.
 AILERON CONTROL LOAD LIMITER

CABLE AA
7. CABLE ACBA
4.
 CABLE AA

5.
 CABLE AB

6.
 CABLE ACBB


SEE BFWD RIG PIN A/S-1
A
Aileron Control Load Limiter Installation Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-05
 ALL  ú ú 02 Page 404 ú Jun 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

1ST OFFICER'S CONTROL COLUMN

(2 LOCATIONS LOWER,  (4 LOCATIONS LOWER,
12.  BOLTS CONNECTING
2 LOCATIONS HIGHER)  4 LOCATIONS HIGHER)
LOWER BEAM TO INBDSTRUCTURE
13.  
WASHER

14.  
NUT
(6 LOCATIONS)

 

FWD


Aileron Control Load Limiter Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(96)