 adjustment, do the steps that follow:
 a) Supply power to the voltmeter (the power necessary for

 the voltmeter is on the voltmeter placard). b) Put the switch S1 on the voltmeter to ON. c) Let the voltmeter become warm for 10 minutes. d) Put the switch S2 on the voltmeter to CAL CHK. e) Make sure the IN PHASE VOLTS meter shows between 9.990
 and 10.010. f) Put the switch S2 to RUN. g) Disconnect the electrical connector from the right
 CLCP. h) Connect the connector J1 on the voltmeter to the right CLCP with an adapter cable.
 NOTE: 26V, 400 Hz is applied across pins 17 and 18 of
____ the electrical connector and the output voltage is measured across pins 19 and 20 of the electrical connector.
 i) Loosen the checknuts on the control rod.
 j) Adjust the control rod until the IN PHASE VOLTS is 0.0

 +/- 50 MV. k) Make sure you can easily install rig pin A/S-2. l) Tighten the checknuts on the control rod. m) Make sure the IN PHASE VOLTS reads 0.0 +/- 50mV.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-08
 ALL  ú ú 01 Page 209 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 n) Disconnect the voltmeter and the adapter from the right CLCP. o) Connect the electrical connector to the right CLCP.
 2)  If you use the ground test for the transducer outputs for the adjustment, do the steps that follow: a) Do this task: "Ground Test - Transducer Outputs"
 (AMM 22-10-00/501).
 NOTE: Only do a check on the aileron surface position.
____
 b)  Monitor the right "AILERON SURFACE POSITION" display
 value. c) Loosen the checknuts on the control rod. d) Adjust the control rod until the right display value is
 0.1 degrees or less. e) Make sure you can easily install rig pin A/S-2. f) Tighten the checknuts on the control rod. g) Make sure the right display value is 0.1 degrees or
 less.
 (b)  
The control rod (connected to the CLCP actuator upper clevis) from the right CLCP to the left spoiler differential mechanism. 1) With rig pin A/S-2 installed, adjust the control rod until

 you can easily install rig pin A/S-4.
 2) Tighten the checknut on the control rod.


 (c)  
The force load limiter rod between the left and right CLCPs.


 1)  If you use the phase synchronous voltmeter, do the steps that follow: a) Connect the voltmeter to the left CLCP located in the
 right wheel well. b) With rig pin A/S-2 installed, adjust the control rod
 until the output voltage is 0.0 +/- 0.05 volts. c) Tighten the checknut on the control rod. d) Make sure the IN PHASE VOLTS reads 0.0 +/- 50 MV.
 2)  If you use the ground test for the transducer outputs (AMM 22-10-00/501), do these steps: a) With rig pin A/S-2 installed, adjust the control until
 the left "AILERON SURFACE POSITION" display value is
 0.1 degrees or less. b) Tighten the checknut on the control rod.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-08
 ALL  ú ú 01 Page 210 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 (d)

(e)

(f)

(g)

(h)


A
747-400 MAINTENANCE MANUAL
 c) Make sure the left "AILERON SURFACE POSITION" display
 value is 0.1 degrees or less.The control rod (connected to the CLCP actuator upper clevis) from the left CLCP to the right spoiler differential mechanism. 1) With rig pin A/S-2 installed, adjust the control rod until
 you can easily install rig pin A/S-5. 2) Tighten the checknuts on the control rod.The control rod (connected to the CLCP upper input lever) between the autopilot actuator and the trim and feel mechanism. 1) If you use the phase synchronous voltmeter, do the steps
 that follow:
 a) Connect the voltmeter to the autopilot actuator.
 b) With rig pin A/S-2 installed, adjust the control rod

 until the output voltage is 0.0 +/- 0.05 volts. c) Tighten the checknut on the control rod. d) Make sure the IN PHASE VOLTS reads 0.0 +/- 50 MV.
 2)  If you use the ground test for the transducer outputs (AMM 22-10-00/501), do these steps: a) With rig pin A/S-2 installed, adjust the control rod
 