• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:50来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE:____ The antirotation plate holds the bolthead when you tighten the nut.
 (9)  S 434-042Install the actuator piston (27) of the power control package. (a) Move the aileron to the full up position. (b) Connect the actuator piston to the aileron with the nuts (43), hinge bolt (28), bushing (29), washers (44) and retaining ring (45) (Section A-A).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-01
 ALL  ú ú 03 Page 412 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (c)  
Use a spanner wrench to measure the friction torque of the nut.

 (d)  
Tighten the nut to 2250-2450 pound-inches more than the friction torque.


 S 434-051
 (10)
 Install the transmitter control rod to the aileron leading edge.

 S 434-043

 (11)
 Install the bonding jumper (9) at the outboard primary hinge:

 (a)  
Use the milliohmmeter to make sure there is a maximum of 0.010 ohms across the bonding jumpers.


 S 864-021
 (12)
 Supply hydraulic power (system No. 1 or 3 for the left aileron, system No. 2 or 4 for the right aileron) (AMM 29-11-00/201).

 S 494-022

 (13)
 Move the captain's and first officer's control wheels to the neutral position.

 S 484-047

 (14)
 Attach the straightedge across the edges of thumbrests with a clamp on the control wheels.

 S 864-023

 (15)
 Supply electrical power (AMM 24-22-00/201).

 S 494-024

 (16)
 Operate the trim switch until you can easily install rig pin A/S-8 or A/S-9 (as applicable).

 S 864-025

 (17)
 Remove electrical power if it is not necessary (AMM 24-22-00/201).

 S 494-035

 (18)
 If you use the inboard aileron rigging straightedge, install the tool as follows:

 (a)
Set the tool at the centerline of the inboard primary hinge.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-01
 ALL  ú ú 02 Page 413 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 494-036
 (19)
 If you use the inboard aileron rigging beam, do these steps:

 (a)  
Open the access panels (573AB, left, 673AB, right)
 (AMM 06-09-08/201).


 (b)  
Hold the rigging beam manually at WBL 461.5 below the aileron and the wing.


 S 224-027
 (20)
 Make sure the lower surface of the inboard aileron aligns with the lower surface of the wing trailing edge (use a tolerance of 0.25 inch) (Fig. 402).

 (a)  
If it is necessary, adjust the input control rod to align the aileron with the wing lower surface.


 S 824-052
 (21)
 Adjust the transmitter(s) (AMM 27-18-00/501).

 S 084-029

 (22)
 Remove the straightedges from the wing and the aileron control wheels.

 S 714-030

 (23)
 Operate the aileron control wheel through a minimum of two full cycles.

 S 714-034

 (24)
 Make sure the aileron operates correctly (Fig. 402).

 (25)
 Remove hydraulic power (AMM 29-11-00/201).

 (26)
 Close the access panels.

 (27)
 Install the coverplates.


 S 864-031
 S 414-032
 S 434-045
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-01
 ALL  ú ú 02 Page 414 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 INBOARD AILERON - INSPECTION/CHECK
__________________________________
 1.  General_______
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(77)