• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:50来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Special Tools and Equipment
 (1)  
G12001-50 Rig Pin Kit

 (2)  
MIT6504001-41 Control Wheel Straightedge

 (3)  
ME65B04001 Rigging Beam. (Recommended)

 (4)  
8MIT65B04001 Straightedge (Alternative).

 (5)  
ST2580-267 Spanner Wrench

 (6)  
6MIT65B04002 Spanner Wrench

 B.
Consumable Materials

 (1)  
D00013 Grease - MIL-G-23827

 C.
References

 (1)  
06-09-08/201, Wing Access Doors and Panels

 (2)  
24-22-00/201, Manual Control

 (3)  
29-11-00/201, Main Hydraulic Supply System

 (4)  
32-00-30/201, Landing Gear Door Lock

 (5)  
IPC 27-11-12 Fig. 2

 (6)  
SSM 27-11-01

 (7)  
WDM 27-11-11

 D.
Access

 (1)  
Location Zone
 579 Inboard Aileron, LH
 679 Inboard Aileron, RH


 (2)  
Access Panel
 573AB Inboard Aileron Actuator, LH
 573BB Inboard Aileron Actuator, LH
 573CB Hydraulic, LH
 673AB Inboard Aileron Actuator, RH
 673BB Inboard Aileron Actuator, RH
 673CB Hydraulic, RH


 E.
Procedure


 S 424-008
 (1)  
Install the vertical reaction link (Fig. 401):

 (a)  
Apply a thin layer of grease to the forward mounting bolt, the plain bushing, and the flanged bushing.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-07
 ALL  ú ú 01 Page 405 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 CAUTION: MAKE SURE THAT YOU INSTALL THE FLANGED BUSHING CORRECTLY.
_______ FAILURE TO INSTALL THE FLANGED BUSHING CORRECTLY CAN CAUSE DAMAGE TO THE VERTICAL REACTION LINK.
 (b)  
Install the flanged bushing, plain bushing, bushing, and forward mounting bolt (Detail C).

 (c)  
Install the large nut.

 (d)  
Use a spanner wrench to measure the run-on torque.

 (e)  
Tighten the large nut to 40-60 pound-inches more than the run-on torque.

 (f)  
Install the small nut.

 (g)  
Use a spanner wrench to measure the run-on torque.

 (h)  
Tighten the small nut to 40-60 pound-inches more than the run-on torque.

 (i)  
Install the right attach bolt with the washers, bushings, and nut (Detail B).

 (j)  
Make sure the shim distances are larger than 0.005 inch.

 (k)  
Tighten the right attach bolt to 60-180 pound-inches.

 (l)  
Install the left attach bolt with the washers, and nut (Detail A).

 (m)  
Make sure the shim distances are larger than 0.005 inch.

 (n)  
Tighten the left attach bolt to 60-180 pound-inches.

 (o)  
Install the quadrant mounting bracket on top of the vertical reaction link with four bolts, washers, and nuts.

 (p)  
Tighten the nuts to 30-40 pound-inches.


 S 864-009
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE CONTROL
_______ SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. THIS WILL PREVENT POSSIBLE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (2)  
Do this task: "Hydraulic System Pressurization" (system No. 1 or 3 for the left control package, system No. 2 or 4 for the right control package) (Ref 29-11-00/201).

 (3)  
Do this task: "Supply Electrical Power" (Ref 24-22-00/201).

 S 834-011

 (4)  
Adjust the vertical reaction link:

 (a)  
Manually move the captain's and the first officer's control wheels to the neutral position.


 S 864-010
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-07
 ALL  ú ú 01 Page 406 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(110)