EFF : ALL
53-42-14Page 402
AFT Cargo Compartment Floor Panels - Zone 150 Figure 401/TASK 53-42-14-991-001
R EFF : 001-049, 051-099, 101-101, 106-149, 201-299, 301-399, 53-42-14 Page 403 May 01/05
CES
R **ON A/C 401-499,
R (Ref. Fig. 401C/TASK 53-42-14-991-001-C)
R **ON A/C 001-049, 051-099, 101-101, 106-149, 201-299, 301-399, 401-499,
(1)
Find the end of the cord (7).
(2)
Pull the cord (7) up to remove the sealant from between the floor panels (1).
(3)
Remove the sealant from between the cutouts and the tiedown positions with a non metallic scraper.
(4)
Remove the screws (2), and if installed the washers (8) and the nuts (9).
NOTE : Identify the length of the screws (2), and if installed the
____ position of the washers (8) and the nuts (9). This will help with the installation procedure.
(5) Remove the floor panels (1) and the section hoses (3) and (6). NOTE : Identify the floor panels (1) and the section hoses (3) and
____ (6). This will help with the installation procedure.
**ON A/C 102-105, 151-199,
Subtask 53-42-14-020-050-A
A. Removal of the Floor Panels
**ON A/C 102-105,
(Ref. Fig. 401A/TASK 53-42-14-991-001-A)
**ON A/C 151-199,
(Ref. Fig. 401B/TASK 53-42-14-991-001-B)
EFF : ALL
53-42-14Page 404
AFT Cargo Compartment Floor Panels - Zone 150 Figure 401A/TASK 53-42-14-991-001-A
R EFF : 102-105, 53-42-14 Page 405 May 01/05
CES
R AFT Cargo Compartment Floor Panels - Zone 150 Figure 401B/TASK 53-42-14-991-001-B
EFF : 151-199, 53-42-14 Page 406 Aug 01/03
CES
R R AFT Cargo Compartment Floor Panels - Zone 150 Figure 401C/TASK 53-42-14-991-001-C
R EFF : 401-499, 53-42-14 Page 407 Aug 01/05
CES
**ON A/C 102-105, 151-199,
(1)
Find the end of the cord (7).
(2)
Pull the cord (7) up to remove the sealant from between the floor panels (1).
(3)
Remove the sealant from between the cutouts and the tiedown positions with a non metallic scraper.
(4)
Remove the screws (2), and if installed the washers (8) and nuts (9). NOTE : Identify the length of the screws (2), and if installed the
____ position of the washers (8) and the nuts (9). This will help with the installation procedure.
(5)
Remove the floor panels (1) and the section hoses (3), (4), (5) and (6).
NOTE : Identify the floor panels (1) and the section hoses (3), (4),
____ (5) and (6). This will help with the installation procedure.
**ON A/C ALL
TASK 53-42-14-400-001
Installation of the AFT Cargo-Compartment Floor-Panels Zone 150
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint free cloth No specific non metallic scraper No specific access platform 2 m (6 ft. 7 in.) No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific FIBER GLASS CORD 1.1MM DIA. (DAN107-1) Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 09-005 USA MIL-S-81733 CLASS C CORROSION INHIBITIVE INTERFAY SEALANT (Ref. 20-31-00)
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
EFF : ALL
53-42-14Page 409
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(80)