Nov 01/04
R
CES C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
ASRM 53-46-11-101 (for corrective action)
53-41-00-991-032 Fig. 628
3. Job Set-up
__________
Subtask 53-41-00-010-113
A. Get Access:
(1)
Open the AFT cargo-compartment door (Ref. TASK 52-30-00-860-001).
(2)
Put the access platform in position adjacent the AFT cargo-compartment door.
(3)
Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint free cloth.
4. Procedure
_________ (Ref. Fig. 628/TASK 53-41-00-991-032) R **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Subtask 53-41-00-210-092
A. Examine the AFT cargo door lock fittings and the adjacent structure between FR53 and FR55A, external part (6 places) for:
-corrosion,
-cracks
-and other damage.
NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-46-11-101) for the
____
correct repair procedure.
AFT Cargo Door Lock Fittings Figure 628/TASK 53-41-00-991-032
R EFF : CES ALL 53-41-00 Page A619 Nov 01/04
R **ON A/C 151-199, 401-499,
Subtask 53-41-00-210-092-A
A. Examine the AFT cargo door lock fittings and the adjacent structure between FR56 and FR58A, external part (6 places) for:
-corrosion,
-cracks
-and other damage.
NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-46-11-101) for the
____
correct repair procedure.
**ON A/C ALL
Subtask 53-41-00-916-082
B. Temporary Protection Procedure
(1) Apply STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-006) or STORAGE PRESERVATION (Material No. 15-005A) to the inspection area as necessary.
5. Close-up
________
Subtask 53-41-00-410-111
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the access platform(s).
(3)
Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
TASK 53-41-00-210-041
Detailed Visual Inspection of Aft Passenger/Crew Door Cutout, underneath the scuff-Plate, LH/RH
1. Reason for the Job
__________________
Refer to the MPD TASK: 534136-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lint free cloth
No specific access platform 3.50 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-10-00-010-001 Opening of the Passenger/Crew Door 52-10-00-410-001 Closing of the Passenger/Crew Door 53-45-15-000-001 Removal of the Scuff Plates at the AFT Passenger/Crew
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(16)