 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.8 m (5 ft. 11 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-80-00-000-001 Removal of the Insulation Blankets 25-80-00-400-001 Installation of the Insulation Blankets 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 53-42-14-000-001 Removal of the AFT Cargo-Compartment Floor-Panels Zone 150 53-42-14-400-001 Installation of the AFT Cargo-Compartment
 Floor-Panels Zone 150 NTM 5341566 ASRM 53-46-11-101 (for corrective action) 53-41-00-991-015 Fig. 611
 EFF : ALL 53-41-00Page C606

Nov 01/04
R
 CES  3. Job Set-up


__________ Subtask 53-41-00-010-089
 A. Get Access
 (1)
 Open the AFT cargo-compartment door (Ref. TASK 52-30-00-860-001)

 (2)
 Put an access platform in position below the cargo door.

 (3)
 Remove the AFT cargo-compartment floor-panels 151DF and 151GF (Ref. TASK 53-42-14-000-001).

 (4)
 Remove the insulation blankets (Ref. TASK 25-80-00-000-001). NOTE : Identify the insulation blankets for installation.


____
 4. Procedure
_________ (Ref. Fig. 611/TASK 53-41-00-991-015) Subtask 53-41-00-220-053
 A. Inspection
 (1) Do a nondestructive test on the internal parts of the lock fittings and the adjacent structure at the AFT cargo-compartment door (Ref. NTM 5341566).
 NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-46-11-101) for
____
 the correct repair procedure.

 5. Close-up
________ Subtask 53-41-00-410-090
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the insulation blankets (Ref. TASK 25-80-00-400-001).

 (3)
 Install the AFT cargo-compartment floor-panels 151DF and 151GF (Ref. TASK 53-42-14-400-001).

 (4)
 Remove the access platform(s).


 EFF : ALL 53-41-00Page C607

Nov 01/04
R
 CES


 (5)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 (6)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 EFF : ALL 53-41-00Page C608

Nov 01/04
R
 CES  TASK 53-41-00-220-007


 Special Detailed Inspection of Internal Doubler Forward and AFT Water Service Panel Cutout between STGR38 and STGR42 LH
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 534139-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific abrasive cloth, grade 280
 No specific access platform 1.8 m (5 ft. 11 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004  USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
 Material No. 19-003  USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
51-75-12-300-001  Repair of Major Paint Damage on Light Alloy and
 Composite Material 51-75-12-300-003 Repair of Minor Paint Damage (Topcoat Only) ASRM 51-11-00-001 ASRM 51-22-00-001 ASRM 53-41-11-001 NTM 534139-Part.6 ASRM 51-73-00-001 (for corrective action) ASRM 51-74-00-001 (for corrective action)
 EFF : ALL  53-41-00Page C609

Nov 01/04
R
 CES  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(58)