**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399, 53-41-00-991-031 Fig. 627 R **ON A/C 151-199, 401-499, 53-41-00-991-031-A Fig. 627A
R **ON A/C ALL
3. Job Set-up__________
Subtask 53-41-00-010-112
A. Get Access:
(1) Remove the lavatory D, if installed (Ref. TASK 25-43-41-000-001).
(2) Remove the lavatory E, if installed (Ref. TASK 25-43-42-000-001).
(3) Remove the lavatory F, if installed (Ref. TASK 25-43-43-000-001).
(4) Remove the AFT galley, if installed (Ref. TASK 25-33-41-000-001) and/or (Ref. TASK 25-33-41-000-002).
(5) Remove the floor panels (Ref. TASK 53-32-12-000-002), (Ref. TASK 53-42-12-000-001) and (Ref. TASK 53-42-12-000-002).
R R NOTE : On some aircraft it is not necessary to remove the floor____ panels in the area of FR47 to do this inspection.
R (6) Cleaning
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE_______ SPECIAL MATERIAL. THIS MATERIAL IS DANGEROUS.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R R R (a) Clean the inspection area with CLEANING AGENTS (Material No. 11-003) and a lint free cloth.
CES
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
(Ref. Fig. 627/TASK 53-41-00-991-031) R **ON A/C 151-199, 401-499,
(Ref. Fig. 627A/TASK 53-41-00-991-031-A)
**ON A/C ALL
Subtask 53-41-00-210-091
A. Inspection:
(1) Examine the cabin floor structure, below and 0.5m around the galley and toilet areas for corrosion. If necessary, refer to the ASRM (Ref. ASRM 53-43-00-001) for the correct repair procedure.
NOTE : The door entrance area between FR66 and FR68 is not examined
____
in this procedure.
5. Close-up
________
Subtask 53-41-00-916-075
A. After visual inspection do the following:
(1)
Apply STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-006) to the cabin floor structure (Ref. TASK 51-75-13-916-002).
(2)
Apply STORAGE PRESERVATION (Material No. 15-007) or STORAGE PRESERVATION (Material No. 15-008) or equivalent to the cabin floor structure (Ref. TASK 51-75-13-916-002).
Cabin Floor Structure - FR47 thru FR70 Figure 627/TASK 53-41-00-991-031
R EFF : 001-049, 051-099, 101-149, 201-299, 301-399, 53-41-00 Page A614 May 01/05
CES
Cabin Floor Structure - FR47/51 thru FR70 Figure 627A/TASK 53-41-00-991-031-A
R EFF : 151-199, 401-499, 53-41-00 Page A615 Aug 01/05
CES
Subtask 53-41-00-410-110
B. Close Access:
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the floor panels (Ref. TASK 53-32-12-400-002), (Ref. TASK 53-42-12-400-001) and (Ref. TASK 53-42-12-400-002).
(3)
Install the lavatory D, if removed (Ref. TASK 25-43-41-400-001).
(4)
Install the lavatory E, if removed (Ref. TASK 25-43-42-400-001).
(5)
Install the lavatory F, if removed (Ref. TASK 25-43-43-400-001).
(6)
Install the AFT galley, if removed (Ref. TASK 25-33-41-400-001) and/or (Ref. TASK 25-33-41-400-002).
EFF : ALL 53-41-00Page A616
Nov 01/04
R
CES TASK 53-41-00-210-038
General Visual Inspection of AFT Cargo Door Lock Fittings and Surrounding Structure, External Portion (6 places)
1. Reason for the Job
__________________
Refer to the MPD TASK: 534157-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lint free cloth
No specific access platform 1.8 m (5 ft. 11 in.)
B. Consumable Materials 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(15)