• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:50来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 B. Close Access
 (1)
 Install the rear pressure-bulkhead cover (1).

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Close the access door 312AR.

 (4)
 Remove the access platform(s).

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 EFF : ALL
53-51-00Page 656


 Rear Pressure Bulkhead Cutouts
 Figure 614/TASK 53-51-00-991-015
 EFF :  ALL  53-51-00 Page 657 
Feb 01/98
 CES 

 

 TASK 53-51-00-210-017
 Detailed Visual Tnspection of Shear Ties and Frame Clips at FR72 and FR74, between Stringer 3 and Stringer 9, LH/RH, Internal Structure
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 535119-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
R  No specific flashlight No specific lint free cloth R No specific access platform 3 m (9 ft. 10 in.)
 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
Material No. 11-004  USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)

 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
ASRM 53-00-12-201
 53-51-00-991-017 Fig. 615

 EFF : ALL
53-51-00Page 658


 3. Job Set-up
__________
 Subtask 53-51-00-010-073
 A. Get Access
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION
_______
 BEFORE YOU START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 (1)
 Put the access platform in position below the access door 312AR.

 (2)
 Open the access door 312AR.

 (3)
 Take a flashlight to do the inspection.


 Subtask 53-51-00-110-064
 B. Cleaning Procedure
R WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE
_______ R MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
 WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
_______ AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
 (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint free cloth , if necessary. Make sure the area is dry before you continue.
 EFF : ALL
53-51-00Page 659

 4. Procedure
_________

 Subtask 53-51-00-210-069
 A. Detailed Visual Inspection Procedure
 (Ref. Fig. 615/TASK 53-51-00-991-017)

 (1) Do a detailed visual inspection of the shear ties and the frame clips at FR72 and FR74, between stringer 3 and stringer 9, LH and RH, internal structure for cracks.
 NOTE : If required, for information on repair procedures for cracks,
____ refer to the ASRM frames (Ref. ASRM 53-00-12-201).
 5. Close-up
________
 Subtask 53-51-00-410-071
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 312AR.

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and


 standard tools and all other items. R
 EFF : ALL
53-51-00Page 660


 Shear Ties and Frame Clips at FR72 and FR74, between Stringer 3 and Stringer 9,
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(112)