_________
(Ref. Fig. 635/TASK 53-41-00-991-046) Subtask 53-41-00-210-106
A. Inspection
(1) Inspect the seealing profile of the bulk cargo door cutout at the upper corners for:
-corrosion,
-cracks
-and any other damage.
NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-41-11-101) for
____
the correct repair procedure.
Subtask 53-41-00-916-081
B. Temporary Protection Procedure
(1) Apply STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-005A) or STORAGE PRESERVATION (Material No. 15-006) or equivalent to the inspection area as necessary.
5. Close-up
________ Subtask 53-41-00-410-136
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the BULK cargo compartment door (Ref. TASK 52-30-00-860-008).
(3)
Remove the access platform(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R EFF : 001-049, 051-099, 101-149, 221-221, 53-41-00Page A665 224-224, 228-228, May 01/05
CES
Sealing Profile of the Bulk Cargo Door Cutout at the Upper Corners Figure 635/TASK 53-41-00-991-046
R EFF : 001-049, 051-099, 101-149, 221-221, 53-41-00Page A666 224-224, 228-228, May 01/05
CES TASK 53-41-00-210-805
General Visual Inspection of Bulk Cargo Door Stop Fittings and Back-Up Structure, at FR60 and FR62 (10 Places)
1. Reason for the Job
__________________
Refer to the MPD TASK: 534167-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint-free cloth
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-003 USA ASTM D 740
METHYL-ETHYL-KETONE (Ref. 20-31-00) Material No. 15-005 AIB TN 10138 TYPE I GRADE 2
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00) Material No. 15-006 AIB TN 10138 TYPE I GRADE 3
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-008 Close the Bulk Cargo-Compartment Door ASRM 53-46-11-001 (for corrective action) 53-41-00-991-024 Fig. 620
R EFF : 001-049, 051-099, 101-149, 221-221, 53-41-00Page A667 224-224, 228-228, May 01/05
CES 3. Job Set-up
__________ Subtask 53-41-00-010-139
A. Get Access
(1) Open the bulk cargo-compartment door (Ref. TASK 52-30-00-860-006). WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE
_______
SPECIAL MATERIAL.
THIS MATERIAL IS DANGEROUS.
WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN.
_______
IF YOU DO:
-RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
-WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
(2) Clean the inspection area with CLEANING AGENTS (Material No. 11-003) and a lint-free cloth.
4. Procedure
_________
(Ref. Fig. 620/TASK 53-41-00-991-024) Subtask 53-41-00-210-107
A. Inspection
(1)
Examine the stop fittings of the bulk cargo-compartment door for:
-cracks,
-deformation.
(2)
Examine the internal and external structure adjacent to the stop fittings at the bulk cargo-compartment door. Examine the structure that you can see for:
-cracks,
-corrosion,
-deformation.
NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-46-11-001) for
____
the correct repair procedure.
Subtask 53-41-00-916-083
B. Apply STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-006) to the inspection area.
R EFF : 001-049, 051-099, 101-149, 221-221, 53-41-00Page A668 224-224, 228-228, May 01/05
CES 5. Close-up
________ Subtask 53-41-00-410-137
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(27)