R (7) Remove the blanking caps and connect the electrical equipment:
R (Ref. Fig. 401/TASK 53-58-11-991-008, 402/TASK 53-58-11-991-009)
R (a) Make sure that the electrical connectors are clean and in the
R correct condition.
R (b) Put the electrical harnesses 6533VN/DC1 and 4643VB/3P in position
R between FR78 and FR79 and install and tighten the clamps.
R (c) Install the electrical connector 7138VC/3E and safety the
R connector with corrosion-resistant steel lockwire 0.6 mm (0.0236
R in.) dia.
R (d) Put the electrical harness 4210VB/3E in position and install and
R tighten the clamps.
R (e) Connect the electrical connectors 7120VC-A/1M and 7118VC-A/1S.
R (f) Connect the electrical connectors 7116VC and 11LJ.
R (g) Connect the electrical wiring to the switch 8QC.
R (h) Connect the electrical connectors 11WF-A and 12WF-A.
R (i) Install the electrical harnesses 6528VN/DC2, 6760VN/B1 and
R 6761VN/DC1.
R (j) Install and tighten the clamps on the electrical harnesses
R 4213VB/1M and 4207VB/1M.
R (k) Install the electrical harness 7519VP.
R (l) Connect the electrical cable 6750VN/DC1.
R (m) Connect the electrical connector 21WG-A and 22WG-A.
R (n) Connect the electrical cable 6757VN/DC1.
R (o) Install the electrical harness 4622VB/3G and connect it to the
R terminal block 7508VT.
R (p) Install and tighten the clamps on the electrical harness
R 4622VB/3G between FR77 and FR79.
R (q) Install and tighten the clamps on the electrical harnesses
R 4631VB/1M and 4622VB/3G.
R (r) Connect the connector 7527VC to the APU air-intake actuator.
R R (s) Install and tighten the clamps on the electrical harness 4631VB/1M.
R R (8) Apply the STORAGE PRESERVATION (Material No. 15-007) to the internal surfaces of the tail cone (Ref. TASK 51-75-13-916-002).
**ON A/C 001-049, 101-105, 151-199, 201-210,
Subtask 53-58-11-710-052-B
C. Do these Tests:
(1) Do the operational test of the elevator (Ref. TASK 27-34-00-710-001) and examine the hydraulic hoses 1102GM, 1103GM, 3102GM and 3103GM for leaks.
(2) Do the operational test of the APU fire detection system (Ref. TASK 26-13-00-710-001).
(3) Do the operational test of the APU air-intake flap (Ref. TASK 49-16-00-710-003).
(4) Do the operational test of the APU fuel system (Ref. TASK 28-22-00-710-001) and examine the APU fuel line for leaks.
(5) Do the operational test of the APU (Ref. TASK 49-00-00-710-010).
(6) Do the operational test of the APU bleed-air system (Ref. TASK 36-12-00-710-001).
(7) Do the operational test of the APU compartment lighting (Ref. TASK 33-31-00-710-001).
(8) Do the operational test of the navigation lights (Ref. TASK 33-41-00-710-001).
(9) Do the operational test of the anti-collision/strobe lighting (Ref. TASK 33-48-00-710-002).
**ON A/C 051-099,
Subtask 53-58-11-710-052-A
C. Do these Tests:
(1)
Do the operational test of the elevator (Ref. TASK 27-34-00-710-001) and examine the hydraulic hoses 1102GM, 1103GM, 3102GM and 3103GM for leaks.
(2)
Do the operational test of the APU fire detection system (Ref. TASK 26-13-00-710-001).
(3)
Do the operational test of the APU air-intake flap (Ref. TASK 49-16-00-710-001).
(4)
Do the operational test of the APU fuel system (Ref. TASK 28-22-00-710-001) and examine the APU fuel line for leaks.
(5)
Do the operational test of the APU (Ref. TASK 49-00-00-710-004).
(6)
Do the operational test of the APU bleed-air system (Ref. TASK 36-12-00-710-001).
(7)
Do the operational test of the APU compartment lighting (Ref. TASK 33-31-00-710-001).
(8)
Do the operational test of the navigation lights (Ref. TASK 33-41-00-710-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(151)