3. Job Set-up
__________
Subtask 53-51-00-010-065
A. Get Access
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION
_______
BEFORE YOU START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1)
Put the access platform in position below the access door 314AR.
(2)
Put a warning notice in position to tell persons not to operate the APU.
(3)
Open the access door 314AR.
(4)
Get access to the inspection area.
(5)
Clean the fittings with a nonmetallic scraper.
(6)
Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cloth.
EFF : ALL
53-51-00Page 631
Feb 01/01
R
CES
4. Procedure
_________
(Ref. Fig. 608/TASK 53-51-00-991-010)
Subtask 53-51-00-210-062
A. Inspection:
(1) Examine the tail-cone attachment fittings for: - corrosion, - broken or missing parts.
R R R R R R NOTE : If necessary:____ - refer to the ASRM (Ref. ASRM 53-51-12-001) for the tail-cone attachment fittings at FR77 - refer to the ASRM (Ref. ASRM 53-56-11-001) and (Ref. ASRM 53-56-11-101) for the tail-cone attachment fittings at FR78 for the correct repair procedure.
5. Close-up________
Subtask 53-51-00-916-062
A. Apply STORAGE PRESERVATION (Material No. 15-007) to the fittings (Ref. TASK 51-75-13-916-002).
Subtask 53-51-00-410-063
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Close the access door 314AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
EFF : ALL
53-51-00Page 632
Tail-Cone Attachment Fittings
Figure 608/TASK 53-51-00-991-010
EFF : ALL 53-51-00 Page 633
Feb 01/98
CES
TASK 53-51-00-210-010
Detailed Visual Inspection of Fin to Fuselage MID and AFT Attach Fittings inside Fuselage, in Areas of Attachment to Fuselage Skin and to FR72 and FR74
1. Reason for the Job
__________________
Refer to the MPD TASK: 535160-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lint-free cloth
No specific access platform 3 m (9 ft. 10 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
Material No. 15-005 AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
Material No. 15-006 AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(106)