the fuselage internal structure between FR70 and FR71, from stringer 26 LH/RH to the bottom center line.
NOTE : Refer to the following SRM procedures (Ref. ASRM 530011),
____ (Ref. ASRM 530012), (Ref. ASRM 530013) for any necessary repairs.
5. Close-up
________
Subtask 53-51-00-914-050
A. If the levelling compound/sealant is in a bad condition, you must:
(1)
Carefully remove the levelling compound/sealant from around the drain pipe with a nonmetallic scraper.
(2)
Apply SEALANTS (Material No. 09-013) to the area around the drain pipe.
EFF : ALL
53-51-00Page 603
Pressure Bulkhead and FR70-71
Figure 601/TASK 53-51-00-991-001
EFF : ALL 53-51-00 Page 604
Feb 01/98
CES
Subtask 53-51-00-916-050
B. Apply STORAGE PRESERVATION (Material No. 15-005) or equivalent plus STORAGE PRESERVATION (Material No. 15-007) or STORAGE PRESERVATION (Material No. 15-008) or equivalent to the pressure bulkhead and the fuselage internal structure between FR70 and FR71, from stringer 26 LH/RH to the bottom center line (Ref. TASK 51-75-13-916-002).
Subtask 53-51-00-410-050
C. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the rear pressure-bulkhead cover (1).
(3)
Close the access door 312AR.
(4)
Remove the access platform(s).
(5)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
EFF : ALL
53-51-00Page 605
Feb 01/99
R
CES TASK 53-51-00-210-002
Detailed Visual Inspection of Rear Pressure Bulkhead Forward Face below Cabin Floor Level
1. Reason for the Job
__________________
Refer to the MPD TASK: 535121-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.8 m (5 ft. 11 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00)
Material No. 15-005 AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
Material No. 15-006 AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
EFF : ALL
53-51-00Page 606
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-55-12-000-001
25-55-12-400-001 51-75-13-916-001 52-30-00-860-001
52-30-00-860-002 52-30-00-860-003 52-30-00-860-004 ASRM 535116000
53-51-00-991-004
3. Job Set-up
__________ Subtask 53-51-00-010-057
A. Get Access
Removal of the AFT Cargo Compartment Partition FR65Installation of the AFT Cargo Compartment Partition FR65Repair to a layer of Moisture-Removing OilOpen the FWD or AFT Cargo-Compartment Door with the Yellow Electric PumpClose the FWD or AFT Cargo-Compartment Door with the Yellow Electric PumpOpen the FWD or AFT Cargo-Compartment Door with the Hand PumpClose the FWD or AFT Cargo-Compartment Door with the Hand Pump(for corrective action)Fig. 602
R WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION_______
R BEFORE YOU START A TASK ON OR NEAR:
R - THE FLIGHT CONTROLS
R - THE FLIGHT CONTROL SURFACES
R - THE LANDING GEAR AND THE RELATED DOORS
R - COMPONENTS THAT MOVE.
R WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE SPECIAL_______