• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:50来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
52-30-00-860-003 Open the FWD or AFT Cargo-Compartment Door with the Hand Pump 52-30-00-860-004 Close the FWD or AFT Cargo-Compartment Door with the
 Hand Pump
 ASRM 53-41-11-101 (for corrective action)
 53-41-00-991-028 Fig. 625


 3. Job Set-up
__________

 Subtask 53-41-00-010-105
 A. Get Access
 (1)
 Put the access platform below the AFT cargo-compartment door.

 (2)
 Open the AFT cargo-compartment door (Ref. TASK 52-30-00-860-003). WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE


_______
 SPECIAL MATERIAL.
 THIS MATERIAL IS DANGEROUS.

 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (3) Clean the inspection area with CLEANING AGENTS (Material No. 11-003) and a lint-free cloth.
 4. Procedure
_________
 (Ref. Fig. 625/TASK 53-41-00-991-028) Subtask 53-41-00-210-088
 A. Inspection
 (1) Examine the external surface of the AFT cargo-compartment door-cutout upper and lower corners for:
 -cracks,
 -corrosion.
 NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-41-11-101) for

____
 the correct repair procedure.

 EFF : ALL 53-41-00Page A603

Feb 01/02
R
 CES


 AFT Cargo Compartment Door Cutout Figure 625/TASK 53-41-00-991-028
R  EFF : CES  ALL  53-41-00 Page A604 Feb 01/02 

 

 5. Close-up
________ Subtask 53-41-00-410-104
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the access platform(s).

 (3)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-004).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 EFF : ALL 53-41-00Page A605

Feb 01/02
R
 CES  TASK 53-41-00-210-036


 Detailed Visual Inspection of Upper Segment of FR70, Fin to Fuselage FWD Attach Fittings and Area between FR69 and FR70 from STGR6 LH/RH to Crown Center Line
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 534109-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint-free cloth
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-33-41-000-002 Removal of the AFT Galley Unit (6481MM or 6483MM) 25-33-41-400-002 Installation of the AFT Galley Unit (6481MM or
 6483MM) 25-43-43-000-001 Removal of the Lavatory F 25-43-43-400-001 Installation of the Lavatory F 25-80-00-000-001 Removal of the Insulation Blankets 25-80-00-400-001 Installation of the Insulation Blankets ASRM 53-41-17-001 (for corrective action) ASRM 53-51-16-001 (for corrective action) 53-41-00-991-029 Fig. 626
 EFF : ALL 53-41-00Page A606

Feb 01/02
R
 CES  3. Job Set-up


__________ Subtask 53-41-00-010-109
 A. Get Access
 (1)
 Remove the aft galley (Ref. TASK 25-33-41-000-002).

 (2)
 Remove the lavatory F, if installed (Ref. TASK 25-43-43-000-001).

 (3)
 Remove the insulation blankets from the rear pressure bulkhead (Ref. TASK 25-80-00-000-001).


 NOTE : Identify the insulation blankets for installation.
____
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身3(13)