(i)
Install the overheat sensing element 19HF (Ref. TASK 36-22-17-400-001).
(j)
Install the sleeve (2), the sleeve (11) and the lock sleeve (12).
(6)
Connect the hydraulic hoses 1102GM, 1103GM 3102GM and 3103GM: (Ref. Fig. 404/TASK 53-58-11-991-016)
(a)
Remove the blanking plugs from the hoses.
(b)
Connect the hoses (Ref. TASK 20-21-12-911-001) and paint a red telltale mark on the connections.
(c)
Remove any hydraulic fluid leakage (Ref. TASK 51-78-00-615-002).
(7)
Remove the blanking caps and connect the electrical equipment: (Ref. Fig. 401/TASK 53-58-11-991-008, 402/TASK 53-58-11-991-009)
(a)
Put the electrical harnesses 6533VN/DC1 and 4643VB/3P in position between FR78 and FR79 and install and tighten the clamps.
(b)
Install the electrical connector 7138VC/3E and safety the connector with corrosion-resistant steel lockwire 0.6 mm (0.0236 in.) dia.
(c)
Put the electrical harness 4210VB/3E in position and install and tighten the clamps.
(d)
Connect the electrical connectors 7120VC-A/1M and 7118VC-A/1S.
(e)
Connect the electrical connectors 7116VC and 11LJ.
(f)
Connect the electrical wiring to the switch 8QC.
(g)
Connect the electrical connectors 11WF-A and 12WF-A.
(h)
Install the electrical harnesses 6528VN/DC2, 6760VN/B1 and 6761VN/DC1.
(i)
Install and tighten the clamps on the electrical harnesses 4213VB/1M and 4207VB/1M.
(j)
Install the electrical harness 7519VP.
(k)
Connect the electrical cable 6750VN/DC1.
(l)
Connect the electrical connector 21WG-A and 22WG-A.
(m)
Connect the electrical cable 6757VN/DC1.
(n)
Install the electrical harness 4622VB/3G and connect it to the terminal block 7508VT.
(o)
Install and tighten the clamps on the electrical harness
4622VB/3G between FR77 and FR79.
(p) Install and tighten the clamps on the electrical harnesses
4631VB/1M and 4622VB/3G.
(q) Connect the connector 7527VC to the APU air-intake actuator.
(r) Install and tighten the clamps on the electrical harness
4631VB/1M.
(8) Apply STORAGE PRESERVATION (Material No. 15-007) to the inside of the
tail cone (Ref. TASK 51-75-13-916-002).
R **ON A/C 301-399,
R Subtask 53-58-11-420-052-C
R B. Installation
R (1) Install the Tail Cone:
R (Ref. Fig. 407/TASK 53-58-11-991-013, 408/TASK 53-58-11-991-014)
R (a) Put the crane in position.
R (b) Attach the SLING - R/I TAILCONE to the crane.
R (c) Attach the sling to the hoisting lugs on the tail cone.
R (d) Lift the tail cone into position.
R (e) Make sure that the tail cone bearing (67) aligns with the
R fuselage spigot (66).
R (f) Remove the installation adaptors (77) from the EXTRACTOR - ATTACH
R BOLTS, TAIL CONE (98A53407566005) kit and install the adaptors on
R the attach bolts (70).
R NOTE : The tool kit with the partnumber 98A53407566005 supersedes____
R the tool kit with the partnumber 98A53407566002. If only
R the tool kit with the partnumber 98A53407566002 is
R available, then it is recommended to continue to use this
R tool kit.
R (g) Apply the COMMON GREASE (Material No. 04-004) to the attach bolts
R (70).
R (h) Install the attach bolts (70) in the upper attach fittings.
CES
R (i) Remove the installation adaptors from the upper attach bolts (70)
R and install the nuts (72).
R (j) Install the attach bolts (70) in the lower attach fittings.
R (k) Remove the installation adaptors from the lower attach bolts (70)
R and install the nuts (72).
R (l) TORQUE the nuts (72) to between 0.57 and 0.79 m.daN (50.44 and
R 69.91 lbf.in).
R (m) Safety the nuts (72) with the new cotter pins (73).
R (n) Apply the STORAGE PRESERVATION (Material No. 15-007) to the
R threads of the bolts. (Ref. TASK 51-75-13-916-002)
R (o) Protective treatment.